Difference between revisions of "NGEE September 2015 Barrow"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 10: Line 10:
 
* fly up
 
* fly up
 
* survey extents of camera again
 
* survey extents of camera again
 +
** survey rod & gps
 +
** maybe bring up a water boiler and a flat pack water container.
 
* take down tower
 
* take down tower
* go does his work
+
** large wrench for unistrut fittings
 +
** 1/2", 7/16", 5/16" nut drivers etc
 +
** screw drivers
 +
**
 +
* Go does his work
  
 
===Tuesday===
 
===Tuesday===

Revision as of 14:27, 26 September 2015

Barrow trip:

To Bring:

  • Survey GPS
  • Survey Rod
  • Survey Tripod
  • UPS

Monday

  • fly up
  • survey extents of camera again
    • survey rod & gps
    • maybe bring up a water boiler and a flat pack water container.
  • take down tower
    • large wrench for unistrut fittings
    • 1/2", 7/16", 5/16" nut drivers etc
    • screw drivers
  • Go does his work

Tuesday

  • we move tower back out to cake eater road
  • put batteries back at A site
  • battery backup at control shed
  • replace dreamplug
  • visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are)
  • Ship tower back to Fairbanks

Wednesday

  • Return to Fairbanks