Difference between revisions of "NGEE September 2015 Barrow"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | [[NGEE]] | ||
Barrow trip: | Barrow trip: | ||
Revision as of 14:28, 26 September 2015
NGEE Barrow trip:
Contents
To Bring:
- Survey GPS
- Survey Rod
- Survey Tripod
- UPS
Monday
- fly up
- survey extents of camera again
- survey rod & gps
- maybe bring up a water boiler and a flat pack water container.
- take down tower
- large wrench for unistrut fittings
- 1/2", 7/16", 5/16" nut drivers etc
- screw drivers
- Go does his work
Tuesday
- we move tower back out to cake eater road
- put batteries back at A site
- battery backup at control shed
- replace dreamplug
- visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are)
- Ship tower back to Fairbanks
Wednesday
- Return to Fairbanks