*bring measuring cup set for leveling UVA and UVB sensors | *bring measuring cup set for leveling UVA and UVB sensors | ||
*wire junction to split all instruments needing 12V from logger | *wire junction to split all instruments needing 12V from logger | ||
+ | *swap in fancier wind sensor | ||
+ | *fill in serial numbers of all instruments/loggers on google sheet | ||
+ | *swap out HMP155s | ||
+ | **write down which height is which SN | ||
+ | *swap out quantum sensors | ||
+ | **bring mini wrench to replace them | ||
+ | **<s>figure out what the connection is like at toolik</s> | ||
+ | **<s>change calibration constant?</s> | ||
+ | *swap CNR4 | ||
+ | *remove old radio | ||
+ | *get field books from Brie | ||
+ | *install new barometer | ||
+ | **change program calibration constants | ||
+ | *change UVA + UVB program calibration constants: UVA:0.0221, UVB: 0.00178 (per Lija's email) | ||
+ | *we zero out the CMP6, but not the CNR4. reconsider? | ||
− | + | ==install new evap pan== | |
**leak test (marine epoxy in case of leaks. should be up in the EDC office) | **leak test (marine epoxy in case of leaks. should be up in the EDC office) | ||
**clean out bottom | **clean out bottom | ||
Line 20: | Line 35: | ||
− | + | ==calibrate precip== | |
− | + | Tipping bucket | |
− | |||
**fill bottle to line, use smallest orifice, do this 3 times | **fill bottle to line, use smallest orifice, do this 3 times | ||
**should be 30mm per bottle, so 90mm total | **should be 30mm per bottle, so 90mm total | ||
**change multiplier in program if necessary | **change multiplier in program if necessary | ||
− | + | ||
+ | Pluvio accuracy test | ||
**received software in ftp from ott (on my fancy laptop, need to transfer to toughbook) | **received software in ftp from ott (on my fancy laptop, need to transfer to toughbook) | ||
**need usb cable | **need usb cable | ||
− | + | ==download garden cam images== | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
** bring replacement batteries | ** bring replacement batteries | ||
** to turn off: press and hold organge power button until 3 beeps and green LED turns off | ** to turn off: press and hold organge power button until 3 beeps and green LED turns off | ||
Line 44: | Line 51: | ||
** to turn on:press and hold organge power button until green LED lights up. after a few sec beep twice. green LED every 15 sec indicates normal running. if any other beeping or lights, consult manual | ** to turn on:press and hold organge power button until green LED lights up. after a few sec beep twice. green LED every 15 sec indicates normal running. if any other beeping or lights, consult manual | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | ==To change on instrumentation website== | |
** pluvio is actually version 2 | ** pluvio is actually version 2 | ||
** lake temp measurement | ** lake temp measurement | ||
** barometer | ** barometer | ||
− | + | ==program changes== | |
*evap pan calibration | *evap pan calibration | ||
*possible tipping bucket calibration | *possible tipping bucket calibration | ||
*possible pluvio calibration | *possible pluvio calibration | ||
+ | *UVA+UVB corrections | ||
+ | |||
− | + | ==to bring== | |
**laptop + charger | **laptop + charger | ||
**field laptop + charger | **field laptop + charger |
Revision as of 10:35, 3 June 2016
- take photos of sensors without pics on instrumentation site
- bring measuring cup set for leveling UVA and UVB sensors
- wire junction to split all instruments needing 12V from logger
- swap in fancier wind sensor
- fill in serial numbers of all instruments/loggers on google sheet
- swap out HMP155s
- write down which height is which SN
- swap out quantum sensors
- bring mini wrench to replace them
figure out what the connection is like at toolikchange calibration constant?
- swap CNR4
- remove old radio
- get field books from Brie
- install new barometer
- change program calibration constants
- change UVA + UVB program calibration constants: UVA:0.0221, UVB: 0.00178 (per Lija's email)
- we zero out the CMP6, but not the CNR4. reconsider?
Contents
install new evap pan
- leak test (marine epoxy in case of leaks. should be up in the EDC office)
- clean out bottom
- field calibrate
Calibrate
Fill pan partway with water, measure height with ruler in mm Measure voltage by reading the EvapLevelTemp variable on the program Add more water, measure water depth in pan Measure voltage Calculate multiplier and offset using y = mx+b m(multiplier) = (height1-height2)/(voltage2-voltage1) b(offset) = height1-(m*voltage1)
Change multiplier and offset in program
calibrate precip
Tipping bucket
- fill bottle to line, use smallest orifice, do this 3 times
- should be 30mm per bottle, so 90mm total
- change multiplier in program if necessary
Pluvio accuracy test
- received software in ftp from ott (on my fancy laptop, need to transfer to toughbook)
- need usb cable
download garden cam images
- bring replacement batteries
- to turn off: press and hold organge power button until 3 beeps and green LED turns off
- remove drive, download and clear images on computer
- to turn on:press and hold organge power button until green LED lights up. after a few sec beep twice. green LED every 15 sec indicates normal running. if any other beeping or lights, consult manual
To change on instrumentation website
- pluvio is actually version 2
- lake temp measurement
- barometer
program changes
- evap pan calibration
- possible tipping bucket calibration
- possible pluvio calibration
- UVA+UVB corrections
to bring
- laptop + charger
- field laptop + charger
- tipping bucket calibration box
- gloves, hat(warm and sun)
- tools
- wire junction
- hiking boots,rubber boots,running shoes
- field book
- usb cable for pluvio
- batteries for garden cam
- cookies for brie
- instruments
- anemometer
- CNR4
- Two HMP155s