Difference between revisions of "NGEE Nome April 2016 pt2"

From IARC 207 Wiki
Jump to navigation Jump to search
imported>Bob
(Created page with " Field Plans * First day on site set up tag line for surface water discharge measurements * Snow survey at ___ points across the watershed (still deciding) * survey water sur...")
 
imported>Bob
Line 7: Line 7:
 
* measure discharge once there is measurable flow in the creek
 
* measure discharge once there is measurable flow in the creek
 
*
 
*
 +
 +
* build bridge across creek
 +
* look for Bob's camera
 +
* water quality sampling
 +
** gps positiong
 +
** note time of day & date

Revision as of 08:56, 14 April 2016


Field Plans

  • First day on site set up tag line for surface water discharge measurements
  • Snow survey at ___ points across the watershed (still deciding)
  • survey water surface daily
  • measure discharge once there is measurable flow in the creek
  • build bridge across creek
  • look for Bob's camera
  • water quality sampling
    • gps positiong
    • note time of day & date