Difference between revisions of "Template:Todo"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
* record as-built wiring of soil sensors | * record as-built wiring of soil sensors | ||
+ | |||
+ | 2008 Bear Damage: | ||
+ | * Need anemometer cable, | ||
+ | * solar panel, | ||
+ | * soil profile (?), | ||
+ | * electric fencing checked, | ||
+ | * Measure distance from ground to snow sensor |
Revision as of 11:36, 6 June 2008
site TODO list
- record as-built wiring of soil sensors
2008 Bear Damage:
- Need anemometer cable,
- solar panel,
- soil profile (?),
- electric fencing checked,
- Measure distance from ground to snow sensor