Difference between revisions of "2016 Summer Nome Trip"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | First Trip To Do: | ||
+ | * @ Teller | ||
+ | ** Lily / Bill -- initialize & install surface water probes (Hobo) | ||
+ | ** Bob Bolton -- measure discharge | ||
+ | ** Lily / Bill -- download data from: | ||
+ | *** Radiation site at top of drainage | ||
+ | *** snow temperature site at basin surface water gaging site | ||
+ | *** surface water station | ||
+ | * @ Kougarok | ||
+ | ** if time allows, download data over radio network from Quartz Creek Air field | ||
+ | *** Flag 1 leave radios on full time | ||
+ | *** K1, K2, K3 to retrieve from. | ||
+ | * | ||
To bring back: | To bring back: | ||
− | * All the old precip buckets up high in the storage | + | * All the old precip buckets up high in the uaf storage |
* | * | ||
+ | |||
+ | To ship: | ||
+ | * Hobo boxes | ||
+ | * thaw probes | ||
+ | * Sontek FlowTracker? | ||
+ | |||
To Prep List: | To Prep List: | ||
* make HMP155 cables | * make HMP155 cables | ||
* tripod | * tripod | ||
+ | |||
+ | |||
+ | PRs: | ||
+ | * batteries for small sites | ||
+ | * solar panels for small sites | ||
+ | * freight to Nome | ||
+ | |||
+ | |||
+ | TA: | ||
+ | * car | ||
+ | * touch base with Mike Murphy | ||
+ | |||
Inventory to finish: | Inventory to finish: | ||
* # snow sensors | * # snow sensors | ||
− | * # | + | * # heat flux plates |
− | + | * # assorted brackets | |
+ | |||
+ | Second Trip To Do List: | ||
* Existing Sites @ Kougarok | * Existing Sites @ Kougarok | ||
− | ** Remove lowest section of Tower? | + | ** Remove lowest section of K-met Tower? |
** Level radiometers | ** Level radiometers | ||
** level precip buckets | ** level precip buckets | ||
Line 26: | Line 59: | ||
** put in ground control point | ** put in ground control point | ||
− | New Kougarok site | + | New ~mile 60 Kougarok site |
* radiation | * radiation | ||
* heat flux | * heat flux | ||
* put in ground control point | * put in ground control point | ||
* | * |
Revision as of 15:18, 29 June 2016
First Trip To Do:
- @ Teller
- Lily / Bill -- initialize & install surface water probes (Hobo)
- Bob Bolton -- measure discharge
- Lily / Bill -- download data from:
- Radiation site at top of drainage
- snow temperature site at basin surface water gaging site
- surface water station
- @ Kougarok
- if time allows, download data over radio network from Quartz Creek Air field
- Flag 1 leave radios on full time
- K1, K2, K3 to retrieve from.
- if time allows, download data over radio network from Quartz Creek Air field
To bring back:
- All the old precip buckets up high in the uaf storage
To ship:
- Hobo boxes
- thaw probes
- Sontek FlowTracker?
To Prep List:
- make HMP155 cables
- tripod
PRs:
- batteries for small sites
- solar panels for small sites
- freight to Nome
TA:
- car
- touch base with Mike Murphy
Inventory to finish:
- # snow sensors
- # heat flux plates
- # assorted brackets
Second Trip To Do List:
- Existing Sites @ Kougarok
- Remove lowest section of K-met Tower?
- Level radiometers
- level precip buckets
- general sensor refresh
- Existing Sites @ Council
- Remove lowest section of Tower? @ blueberry hill
- Level radiometers
- level precip buckets
- general sensor refresh
- spend one or two nights with Mike Murphy to reduce travel times?
- radiometer setup to Grid site
- put in ground control point
New ~mile 60 Kougarok site
- radiation
- heat flux
- put in ground control point