Line 23: | Line 23: | ||
To bring back (trip 1): | To bring back (trip 1): | ||
* All the old precip buckets up high in the uaf storage | * All the old precip buckets up high in the uaf storage | ||
− | * | + | * A lot of photos if possible of the storages in Nome & Kougarok for a photo inventory. I took a bunch in May but most were too blurry to be useful. |
To ship: | To ship: |
Revision as of 10:11, 11 July 2016
First Trip To Do:
- @ Teller
- Lily / Bill -- initialize & install surface water probes (Hobo)
- Mark each with colored tape
- set measurement interval to once per 15 minutes
- will be co-located with LANL Isco Samplers (requiring coordination with Brent / Cathy )
- Bob Bolton -- measure discharge @ bridge
- I was measuring on the upstream side of the bridge with the measuring tape strung from one side to the other.
- note water level above screed stakes in channel:
- furthest into the channel on the right bank side, upstream 1-1.5m is #1
- If they are exposed (likely) then measure stage above PT as well as stage immediately up stream of the screed stake.
- Lily / Bill -- download data from:
- Radiation site at top of drainage
- snow temperature site at basin surface water gaging site (& you can turn off the system / disconnect the battery)
- surface water station
- Lily / Bill -- initialize & install surface water probes (Hobo)
- @ Kougarok
- if time allows, download data over radio network from Quartz Creek Air field
- Flag 1 leave radios on full time
- K1, K2, K3 to retrieve from.
- if time allows, download data over radio network from Quartz Creek Air field
To bring back (trip 1):
- All the old precip buckets up high in the uaf storage
- A lot of photos if possible of the storages in Nome & Kougarok for a photo inventory. I took a bunch in May but most were too blurry to be useful.
To ship:
- Hobo boxes
- thaw probes
- Sontek FlowTracker
- Bill's list of things
To Prep List:
- make HMP155 cables
- tripod
PRs:
- batteries for small sites
- solar panels for small sites
- freight to Nome
TA:
- car
- touch base with Mike Murphy
Second Trip:
August 11 - 19
Second Trip To Do List:
- Existing Sites @ Kougarok
- Remove lowest section of K-met Tower?
- Level radiometers
- level precip buckets
- general sensor refresh
- Existing Sites @ Council
- Remove lowest section of Tower? @ blueberry hill
- Level radiometers
- level precip buckets
- general sensor refresh
- spend one or two nights with Mike Murphy to reduce travel times?
- radiometer setup to Grid site
- put in ground control point
New ~mile 60 Kougarok site
- radiation
- heat flux
- put in ground control point
Inventory:
Met
- snow sensors
- 4 Judd voltage out
- 6 SR50A
- 9 HMP155 shields
- 1 RM Young WS/WD
- 8pcs 014A WS (for Barrow)
- 1 pcs 014B WD
- 4-5 WS/WD 05103 Anemometers in need of a bearing replacement
Soil
- 5 heat flux plates
- 15 Hydraprobes
- 8 soil thermal conductivity
- 12 soil heat capacity
Infrastructure
- 5 CSI Boxes
- # assorted brackets
- 4 sunguard 4.5A charge controllers
- 1 sunsaver 6.0A charge controller
- 1 3m Tripod at UPark
- 1 3m tripod kit in IARC106