First Trip To Do:

  • @ Teller
    • Lily / Bill -- initialize & install surface water probes (Hobo)
      • get a weight at the UAF nome storage
      • Mark each with colored tape
      • set measurement interval to once per 15 minutes
      • will be co-located with LANL Isco Samplers (requiring coordination with Brent / Cathy )
    • Bob Bolton -- measure discharge @ bridge
      • I was measuring on the upstream side of the bridge with the measuring tape strung from one side to the other.
      • note water level above screed stakes in channel:
        • furthest into the channel on the right bank side, upstream 1-1.5m is #1
        • If they are exposed (likely) then measure stage above PT as well as stage immediately up stream of the screed stake.
    • Lily / Bill -- download data from:
      • Radiation site at top of drainage
      • snow temperature site at basin surface water gaging site (& you can turn off the system / disconnect the battery)
      • surface water station
  • @ Kougarok
    • if time allows, download data over radio network from Quartz Creek Air field
      • Flag 1 leave radios on full time
      • K1, K2, K3 to retrieve from.

@ Council

    • if time allows download blueberry over radio network.
      • ATD8785624

To bring back (trip 1):

  • All the old precip buckets up high in the uaf storage
  • A lot of photos if possible of the storages in Nome & Kougarok for a photo inventory. I took a bunch in May but most were too blurry to be useful.

To ship:

  • Hobo boxes
  • thaw probes
  • Sontek FlowTracker
  • Bill's list of things

To Prep List:

  • make HMP155 cables
  • tripod


PRs:

  • batteries for small sites
  • solar panels for small sites
  • freight to Nome


TA:

  • car
  • touch base with Mike Murphy


Second Trip:

Summer 2016 Nome Trip 2: August 11 - 19

Second Trip To Do List:

  • Existing Sites @ Kougarok
    • Remove lowest section of K-met Tower?
    • Level radiometers
    • level precip buckets
    • general sensor refresh
  • Existing Sites @ Council
    • Remove lowest section of Tower? @ blueberry hill
    • Level radiometers
    • level precip buckets
    • general sensor refresh
    • spend one or two nights with Mike Murphy to reduce travel times?
    • radiometer setup to Grid site
    • put in ground control point

New ~mile 60 Kougarok site

  • radiation
  • heat flux
  • put in ground control point


Inventory:

Met

  • snow sensors
  • 4 Judd voltage out
  • 6 SR50A
  • 9 HMP155 shields
  • 1 RM Young WS/WD
  • 8pcs 014A WS (for Barrow)
  • 1 pcs 014B WD
  • 4-5 WS/WD 05103 Anemometers in need of a bearing replacement

Soil

  • 5 heat flux plates
  • 15 Hydraprobes
  • 8 soil thermal conductivity
  • 12 soil heat capacity

Infrastructure

  • 5 CSI Boxes
  • # assorted brackets
  • 4 sunguard 4.5A charge controllers
  • 1 sunsaver 6.0A charge controller
  • 1 3m Tripod at UPark
  • 1 3m tripod kit in IARC106