Difference between revisions of "Super Site Tower"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 10: Line 10:
 
* wire trimmer
 
* wire trimmer
 
* measuring tape
 
* measuring tape
 +
 +
====Bolting hardware====
 +
* 9/16" Wrench & nut driver / socket
 +
* tool belt, small
 +
*
  
 
===Extra Notes===
 
===Extra Notes===
Line 16: Line 21:
 
* it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
 
* it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
 
* probably need an extension to reconnect the HMP power.
 
* probably need an extension to reconnect the HMP power.
 +
 +
 
===Activity Log===
 
===Activity Log===
 
* 8/29  
 
* 8/29  
Line 24: Line 31:
 
** re-routed at/rh
 
** re-routed at/rh
 
** hauled out bulk of tower clamps & related hardware
 
** hauled out bulk of tower clamps & related hardware
 +
* 9/18-9/28
 +
** tracking down pipe & vehicles
 +
** fleshing out the procedure

Revision as of 12:18, 28 September 2016

To Purchase in town etc

  • 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
  • 4 x 8 x 8, 2 pcs for base

Tools needed

  • small wire snipper
  • flat head screw driver (medium sized)
  • cable ties
  • crimping tool
  • wire trimmer
  • measuring tape

Bolting hardware

  • 9/16" Wrench & nut driver / socket
  • tool belt, small

Extra Notes

  • the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
  • something to keep an eye on. It coincided perhaps with an 8/21 visit.
  • it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
  • probably need an extension to reconnect the HMP power.


Activity Log

  • 8/29
    • re-routed all radiation sensors & temporary rewire
    • powered off AT/RH
    • the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
  • 9/1
    • re-routed at/rh
    • hauled out bulk of tower clamps & related hardware
  • 9/18-9/28
    • tracking down pipe & vehicles
    • fleshing out the procedure