Difference between revisions of "Oliktok precip site"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 47: Line 47:
 
*asked alaska steel for nurail quote, do PR when receive it
 
*asked alaska steel for nurail quote, do PR when receive it
 
*figure out geonor fence
 
*figure out geonor fence
 +
*figure out geonor heater
 
*programs  
 
*programs  
 
**update Barrow
 
**update Barrow

Revision as of 15:11, 8 August 2016

Barrow site

Has:

  • Enclosure
  • CR1000
  • Judd or SR50a
  • Radios/NL100

Needs:

  • LPM
  • Quadpod for:
  • 3x SR50a

Atqasuk

Uninstalling:

  • Nipher guage
  • CR1000
  • 2 radios
  • Wenglor particle counter
  • SR50a
  • quadpod
  • computer?

Oliktok

Installing:

  • Geonor + fence
  • Power AC
  • SR50a on quadpod
  • LPM


Geonor notes

Power

  • LPM uses max 150 VA (VA = watts)
  • Geonor heater draws 25 watts at 24 volts
    • 3.4 mA per vibrating wire. 7 mA on warm up
  • SR50a
    • 250 mA peak measurement (measurement takes less than 1 sec)
    • 1 mA quiescent in SDI12 mode

Todo

  • asked alaska steel for nurail quote, do PR when receive it
  • figure out geonor fence
  • figure out geonor heater
  • programs
    • update Barrow
    • write new for oliktok
  • LPM communication
  • quadpods

Site Location

800px