Difference between revisions of "2017 NGEE June Nome Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 24: Line 24:
 
** Replace the LW Transmitted cable, will need to bring the whole package from Fairbanks
 
** Replace the LW Transmitted cable, will need to bring the whole package from Fairbanks
 
** 10meter AT/RH has not worked since 2011
 
** 10meter AT/RH has not worked since 2011
 +
 +
*todo
 +
**order metric handheld flow rod

Revision as of 13:23, 19 May 2017

  • @ Kougraok M64
    • if we get permission then site at the top perhaps?
    • If no permission then maybe a subset of instruments adjacent to the GIPL Pilgrim site and or hold off until September / the spring.
      • soil pit
        • soil moisture @ 5, 10, 20, 30, 40 cm bgs
        • soil thermal conductivity @ 10, 20, 30, 40 cm bgs
        • soil temperature @ 10, 20, 30, 40 cm bgs
        • soil heat flux near base of active layer & plant / soil boundary
      • 1.5m soil temperature profile
      • snow depth @ tripod
      • snow depth away from tripod
      • interval camera
      • 4 component radiation
      • Spectral response sensors: NDVI & PRI up looking and two vegetation communities
      • 1.5m Air temperature, Relative Humidity, & Dew Point Temperature
      • Wind speed and direction at 3m
      • summer precipitation
  • @ Teller Bottom
    • send one more program to fix 5cm bgs soil moisture out of range array error
  • @ C1 Grid
    • We have a CNR4 for this site I believe.
    • fix MRC portion of program last change we screwed something up and sent the 2011 program with a but rather than the 2012 version.
  • @ C2 Blueberry
    • Replace the LW Transmitted cable, will need to bring the whole package from Fairbanks
    • 10meter AT/RH has not worked since 2011
  • todo
    • order metric handheld flow rod