Difference between revisions of "Super Site Activity Log"

From IARC 207 Wiki
Jump to navigation Jump to search
 
Line 13: Line 13:
 
** three of four pipes temporarily mounted
 
** three of four pipes temporarily mounted
 
** fourth up
 
** fourth up
 +
** screwed in a couple more earth anchors
 
* tinkered with boardwalk
 
* tinkered with boardwalk
*
+
* 9/30 & 10/3
 +
** focused on pipes SE, SW, NW pipes
 +
* 10/4
 +
** removed original helper structure and replaced with permanent structure
 +
** added NE pipe
 +
** wrapped up earth anchor stuff
 +
* 10/5
 +
** start on guy wires

Latest revision as of 09:02, 5 October 2016

Activity Log

  • 8/29
    • re-routed all radiation sensors & temporary rewire
    • powered off AT/RH
    • the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
  • 9/1
    • re-routed at/rh
    • hauled out bulk of tower clamps & related hardware
  • 9/18-9/28
    • tracking down pipe & vehicles
    • fleshing out the procedure
  • 9/29
    • three of four pipes temporarily mounted
    • fourth up
    • screwed in a couple more earth anchors
  • tinkered with boardwalk
  • 9/30 & 10/3
    • focused on pipes SE, SW, NW pipes
  • 10/4
    • removed original helper structure and replaced with permanent structure
    • added NE pipe
    • wrapped up earth anchor stuff
  • 10/5
    • start on guy wires