Difference between revisions of "Dfm2"
Jump to navigation
Jump to search
imported>Eyoucha |
|||
Line 2: | Line 2: | ||
{{todo}} | {{todo}} | ||
+ | |||
+ | *Site had bear damage need to | ||
+ | **replace anemometer cable | ||
+ | **replace solar panel | ||
+ | **repair electric fence | ||
+ | **install flex conduit | ||
= site logs = | = site logs = | ||
Line 11: | Line 17: | ||
− | == 28 August 2007 11:30a, Rob Gieck. (entered by E. Youcha from Rob's field book) | + | == 28 August 2007 11:30a, Rob Gieck. == |
+ | (entered by E. Youcha from Rob's field book) | ||
* looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802 | * looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802 |
Revision as of 11:43, 6 June 2008
Contents
White Hills met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
- Site had bear damage need to
- replace anemometer cable
- replace solar panel
- repair electric fence
- install flex conduit
site logs
- bring 2 posts, post driver, wire insulators; install posts midway in long runs
- secure rain gauge funnel
- flex conduit for antenna, other cables
- bring turnbuckle for N guy
28 August 2007 11:30a, Rob Gieck.
(entered by E. Youcha from Rob's field book)
- looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802
- took distance measurements with circle (cone) method, 2 ft out from sensor: N=117.7 cm, E=119, W=115, S=119.4
- I think the HMP45C was replaced (old SN B0110036 - new SN C11430045)
- fence looked in place
13 July 2007, Ken I.
- electric fence working; taped yellow tags near posts
- fence could use two more posts in middle of long runs
- tightened both wires on NE fence run
- rain gauge funnel not secured
- tripod looks good; guys are a little slack
- site could use flex conduit on tripod wires
- radiation pole is plumb; cables a bit slack
- need turnbuckle on N guy (now secured with nylon cord)
- snow depth sensor off plumb; fitting looks bent; straightened/bent it back, but not quite vertical
9 June 2007, Ken I., Dan R.
- old site dismantled for later removal:
- battery box: about 220 pounds, including 3 batteries
- tower/stand: about 100 pounds
- solar panel REMOVED
- electric fence put up using 4 posts