Difference between revisions of "Spring 2017 visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 6: Line 6:
 
** bring up couple SW12V
 
** bring up couple SW12V
 
*change desiccant in CNR4
 
*change desiccant in CNR4
 +
*clean all rad sensor domes with cloth
  
 +
===bf5 sunshine sensor===
 +
*install BF5 sensor
 +
** tripod is 9ft7in from tower. cable is 5m. so this ''should'' work out
 +
**bring some spare AC power line, inverters and plugs to set up power for heater.
 +
 +
===organize the enclosure===
 +
**zip ties of many colors and sizes
 +
**wires of many colors (mostly red and black)
 +
**white wire connector things
  
 +
===evap pan===
 +
 +
 +
===little activities===
 
*stabilize underwater par sensor with second string for cleaning
 
*stabilize underwater par sensor with second string for cleaning
 
*add terrestrial quantum to sensor wiring notes at top of program
 
*add terrestrial quantum to sensor wiring notes at top of program
Line 19: Line 33:
 
*check if pluvio is pointing north
 
*check if pluvio is pointing north
 
*think about soil temps- at least find them
 
*think about soil temps- at least find them
*install BF5 sensor
 
** tripod is 9ft7in from tower. cable is 5m. so this ''should'' work out
 
**bring some spare AC power line, inverters and plugs to set up power for heater.
 
*set up evap pan
 
*organize the enclosure
 
**zip ties of many colors and sizes
 
**wires of many colors (mostly red and black)
 
**white wire connector things
 
  
 
===at toolik===
 
===at toolik===

Revision as of 15:26, 1 June 2017

CNR4

  • Check out the status of the heater wiring for CNR4
    • is it even wired? to which ports?
    • change the program notes if wired
    • change program controls for heater
    • bring up couple SW12V
  • change desiccant in CNR4
  • clean all rad sensor domes with cloth

bf5 sunshine sensor

  • install BF5 sensor
    • tripod is 9ft7in from tower. cable is 5m. so this should work out
    • bring some spare AC power line, inverters and plugs to set up power for heater.

organize the enclosure

    • zip ties of many colors and sizes
    • wires of many colors (mostly red and black)
    • white wire connector things

evap pan

little activities

  • stabilize underwater par sensor with second string for cleaning
  • add terrestrial quantum to sensor wiring notes at top of program
  • check what the calconnector looks like for lake PAR.
    • maybe need to buy a second one so can coordinate with calibration swaps
    • its reading negative because the sensor head was swapped wrong, but this isn't an issue.
  • change notes in program where measure pressure to change CS100 to CS106
    • remove sea level offset
  • get serial number for radios
  • get height of terrestrial PAR
  • check if pluvio is pointing north
  • think about soil temps- at least find them

at toolik

  • go through all metadata - remember the comments column
  • think about PAR sensors
  • upgrade loggernet

to bring

  • tools http://ngeedata.iarc.uaf.edu/wiki/Tool_list
  • computer + charger
  • field laptop + charger
  • fish tape
  • BF5 sensor + mount+ cable +cable conduit+ electrical accessories
  • CNR4 heater+ cable
    • SW12V BORROWED FROM NGEE, MUST REPLACE IF I USE IT
  • field book
  • copy of wiki

Clothes

  • raincoat
  • rain pants
  • sourdough jacket
  • warm hats
  • gloves and mittens
  • blue muck boots
  • winter hiking boots
  • fleece pants
  • leggings
  • orange fleece
  • wool long sleeve
  • socks, undies
  • work pants

Other Gear

  • -10 sleeping bag and stuff sack
  • sleeping pad
  • beverages