Difference between revisions of "2017 NGEE March Nome Trip"
Jump to navigation
Jump to search
(Created page with "Just a skeleton of a beginning but wanted a place to collect scraps of ideas etc. ====To Do Yet==== * Helicopter Safety Plan * Renew Tracker plans for field season * Make su...") |
|||
Line 6: | Line 6: | ||
* Renew Tracker plans for field season | * Renew Tracker plans for field season | ||
* Make sure GPS systems are compatible between groups | * Make sure GPS systems are compatible between groups | ||
− | * Ship stuff | + | * PR for & Ship stuff (to Nome Gnome?) |
+ | ===Snow Survey Gear=== | ||
+ | * 2x Thermal Conductivity Probes | ||
+ | * 3x Snow density tube | ||
+ | * 1x magnaprobe | ||
+ | * Lots of ziplocs | ||
+ | * snow scale | ||
+ | |||
+ | ====To Purchase yet==== | ||
+ | * ziplocs | ||
+ | * rebar | ||
+ | |||
+ | |||
+ | ==== | ||
====Itinerary==== | ====Itinerary==== | ||
Revision as of 15:33, 15 February 2017
Just a skeleton of a beginning but wanted a place to collect scraps of ideas etc.
Contents
To Do Yet
- Helicopter Safety Plan
- Renew Tracker plans for field season
- Make sure GPS systems are compatible between groups
- PR for & Ship stuff (to Nome Gnome?)
Snow Survey Gear
- 2x Thermal Conductivity Probes
- 3x Snow density tube
- 1x magnaprobe
- Lots of ziplocs
- snow scale
To Purchase yet
- ziplocs
- rebar
==
Itinerary
3/20
- Bob Busey & LANL Crew arrive in Nome
- Hotel opens @ 3pm
- pick up stuff from cargo
- gear
- safety equipment
- groceries
3/21
- Lily Cohen & Bob Bolton arrive in Nome
- Hotel opens @ 3pm
- get settled.
- get groceries
Survey marker trip day:
- 8am start
- 10am arrive on-site and set up survey gps system
- 10:45 snowmachine to the top of the drainage. Work down the hill deploying mark
- ~7 hrs to deploy markers for UAV/helo
- Stop sign
- rebar protection
- rebar
- evening: return to Nome.
3/22
- Begin snow surveys in Teller