Difference between revisions of "2017 NGEE March Nome Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
 
====To Do Yet====
 
====To Do Yet====
 
 
* Helicopter Safety Plan
 
* Helicopter Safety Plan
* Renew Tracker plans for field season
+
* Renew Tracker plans for field season (purchase request submitted for this)
 
* Make sure GPS systems are compatible between groups
 
* Make sure GPS systems are compatible between groups
* PR for &  Ship stuff (to Nome Gnome?)
+
* PR for &  Ship stuff (Nome Gnome receive)
  
===Snow Survey Gear===
+
===General Snow Survey Gear===
 
* 2x Thermal Conductivity Probes
 
* 2x Thermal Conductivity Probes
 
** have one long sensor that still needs to be found.
 
** have one long sensor that still needs to be found.
 
* 3x Snow density tube
 
* 3x Snow density tube
 
* 1x magnaprobe
 
* 1x magnaprobe
* Lots of ziplocs
+
* Lots of labeled ziplocs
 
* snow scale
 
* snow scale
 
* short power point on snow survey techniques
 
* short power point on snow survey techniques
 
* one pager for fieldbooks on what to do
 
* one pager for fieldbooks on what to do
 
* I think UAF will bring out 4 or 5 pairs of snow shoes plus one pair of skis
 
* I think UAF will bring out 4 or 5 pairs of snow shoes plus one pair of skis
* sled
+
* small sled (can haul out by snowmachine on the 21st and leave for our use the rest of the time)
 
* small actionpacker
 
* small actionpacker
 +
* radios so groups can maintain contact
 +
* satellite phone
 +
* satellite tracker
 +
* Snow poles
 +
** http://www.interwestsafety.com/Product/-315/Snow-Poles/
 +
* stop sign control markers
 +
  
 
===Cameras===
 
===Cameras===
 
* pole?
 
* pole?
* email vicky about noodles
+
*
 
 
====To Purchase yet====
 
====To Purchase yet====
 
* ziplocs
 
* ziplocs
 
* rebar
 
* rebar
 
* deadman supplies for markers
 
* deadman supplies for markers
*
+
* ground rod clamps
 +
*  
  
====
 
 
====Itinerary====
 
====Itinerary====
  
Line 58: Line 63:
 
** rebar
 
** rebar
 
* evening: return to Nome.
 
* evening: return to Nome.
 +
* Snow Poles
  
 
====3/22====
 
====3/22====
 
* Begin snow surveys in Teller
 
* Begin snow surveys in Teller
*
+
* Proceed from site to site
 +
 
 +
 
 +
====Random====
 +
* Radio test in Council
 +
* Move base station in Nome

Revision as of 13:53, 22 February 2017

Just a skeleton of a beginning but wanted a place to collect scraps of ideas etc.

To Do Yet

  • Helicopter Safety Plan
  • Renew Tracker plans for field season (purchase request submitted for this)
  • Make sure GPS systems are compatible between groups
  • PR for & Ship stuff (Nome Gnome receive)

General Snow Survey Gear

  • 2x Thermal Conductivity Probes
    • have one long sensor that still needs to be found.
  • 3x Snow density tube
  • 1x magnaprobe
  • Lots of labeled ziplocs
  • snow scale
  • short power point on snow survey techniques
  • one pager for fieldbooks on what to do
  • I think UAF will bring out 4 or 5 pairs of snow shoes plus one pair of skis
  • small sled (can haul out by snowmachine on the 21st and leave for our use the rest of the time)
  • small actionpacker
  • radios so groups can maintain contact
  • satellite phone
  • satellite tracker
  • Snow poles
  • stop sign control markers


Cameras

  • pole?

To Purchase yet

  • ziplocs
  • rebar
  • deadman supplies for markers
  • ground rod clamps

Itinerary

3/20

  • Bob Busey (Noon) & LANL Crew (Evening) arrive in Nome
  • Hotel opens @ 3pm
  • pick up stuff from cargo
    • gear
    • safety equipment
  • groceries

3/21

  • Lily Cohen & Bob Bolton arrive in Nome
  • Hotel opens @ 3pm
    • get settled.
    • get groceries

Survey marker trip day:

  • 8am start
  • 10am arrive on-site and set up survey gps system
  • 10:45 snowmachine to the top of the drainage. Work down the hill deploying mark
  • ~7 hrs to deploy markers for UAV/helo
    • Stop sign
    • rebar protection
    • rebar
  • evening: return to Nome.
  • Snow Poles

3/22

  • Begin snow surveys in Teller
  • Proceed from site to site


Random

  • Radio test in Council
  • Move base station in Nome