Difference between revisions of "2017 NGEE March Nome Trip"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
* Make sure GPS systems are compatible between groups | * Make sure GPS systems are compatible between groups | ||
* PR for & Ship stuff (Nome Gnome receive) | * PR for & Ship stuff (Nome Gnome receive) | ||
+ | * Decide if PDF Maps is worth purchasing or if an alternative is better | ||
===General Snow Survey Gear=== | ===General Snow Survey Gear=== |
Revision as of 13:57, 22 February 2017
Just a skeleton of a beginning but wanted a place to collect scraps of ideas etc.
Contents
To Do Yet
- Helicopter Safety Plan
- Renew Tracker plans for field season (purchase request submitted for this)
- Make sure GPS systems are compatible between groups
- PR for & Ship stuff (Nome Gnome receive)
- Decide if PDF Maps is worth purchasing or if an alternative is better
General Snow Survey Gear
- 2x Thermal Conductivity Probes
- have one long sensor that still needs to be found.
- 3x Snow density tube
- 1x magnaprobe
- Lots of labeled ziplocs
- snow scale
- short power point on snow survey techniques
- one pager for fieldbooks on what to do
- I think UAF will bring out 4 or 5 pairs of snow shoes plus one pair of skis
- small sled (can haul out by snowmachine on the 21st and leave for our use the rest of the time)
- small actionpacker
- radios so groups can maintain contact
- satellite phone
- satellite tracker
- Snow poles
- stop sign control markers
Cameras
- pole?
To Purchase yet
- ziplocs
- rebar
- deadman supplies for markers
- ground rod clamps
Itinerary
3/20
- Bob Busey (Noon) & LANL Crew (Evening) arrive in Nome
- Hotel opens @ 3pm
- pick up stuff from cargo
- gear
- safety equipment
- groceries
3/21
- Lily Cohen & Bob Bolton arrive in Nome
- Hotel opens @ 3pm
- get settled.
- get groceries
Survey marker trip day:
- 8am start
- 10am arrive on-site and set up survey gps system
- 10:45 snowmachine to the top of the drainage. Work down the hill deploying mark
- ~7 hrs to deploy markers for UAV/helo
- Stop sign
- rebar protection
- rebar
- evening: return to Nome.
- Snow Poles
3/22
- Begin snow surveys in Teller
- Proceed from site to site
Random
- Radio test in Council
- Move base station in Nome