Difference between revisions of "2017 NGEE Nome October trip"
Jump to navigation
Jump to search
Line 27: | Line 27: | ||
** place 4 poles at bottom to help outline location of channel for PTs | ** place 4 poles at bottom to help outline location of channel for PTs | ||
* 10/2 (8:27 - 9:12) | * 10/2 (8:27 - 9:12) | ||
+ | ** Teller Top: | ||
+ | *** change desiccant which will require: | ||
+ | **** drill | ||
+ | **** drill bit | ||
+ | **** tap & die | ||
+ | **** replacement machine screws for stripped out ones. | ||
** Teller button up for winter, snow pole remainder | ** Teller button up for winter, snow pole remainder | ||
** remove one PT at the bottom site | ** remove one PT at the bottom site | ||
Line 39: | Line 45: | ||
* Council | * Council | ||
** survey 2017 plots? | ** survey 2017 plots? | ||
− | ** download data | + | ** download data over radio for C2 (at minimum) |
** visit C2? | ** visit C2? | ||
** fix program at C1 | ** fix program at C1 | ||
* 10/6 depart | * 10/6 depart |
Revision as of 14:07, 19 September 2017
Activities:
- teller top:
- double-check data
- thermal conductivity probes working?
- maybe replace cnr4
- and or drill out stripped screws
- teller bottom
- sr50a transducer replacement, 2x
- remove 1 PT
- discharge measurement
- Kougarok m64
- bring guy wire markers for K64 met station (at uaf storage)
Loose Itinerary
- 9/29 (8:18 - 9:36 Twilight to twilight)
- evening: arrive & stay in apartments
- 9/30 (8:21 - 9:19)
- take some storage stuff to dump
- evening: Lily arrives
- stay in hotel
- 10/1 (8:24 - 9:16)
- Teller
- walk the end point of the lines set up in March 2017 and remove the orange poles
- place 4 poles at bottom to help outline location of channel for PTs
- 10/2 (8:27 - 9:12)
- Teller Top:
- change desiccant which will require:
- drill
- drill bit
- tap & die
- replacement machine screws for stripped out ones.
- change desiccant which will require:
- Teller button up for winter, snow pole remainder
- remove one PT at the bottom site
- Teller Top:
- 10/3 (8:30 - 9:09)
- drive to kougarok. download data over radios from K sites
- stretch goal... visit k2 if time for thaw depth measurements
- 10/4 (8:33 - 9:05)
- kougarok m64 winter button up
- ??? soil pit ???
- kougarok m64 finish surveying & deploy snow poles
- 10/5 (8:36 - 9:02)
- Council
- survey 2017 plots?
- download data over radio for C2 (at minimum)
- visit C2?
- fix program at C1
- 10/6 depart