Difference between revisions of "Dbm7"
Jump to navigation
Jump to search
imported>Ken |
|||
Line 2: | Line 2: | ||
{{todo}} | {{todo}} | ||
+ | |||
+ | * Site needs new SR50 (spring 2008) | ||
+ | * measure distance from ground to SR50 | ||
=site logs= | =site logs= |
Revision as of 11:41, 6 June 2008
Lower Kadleroshilik River met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
- Site needs new SR50 (spring 2008)
- measure distance from ground to SR50
site logs
== 14 June 2007, Ken I., Doug K.
- brief stop at site; notes made in field book the next day
- tripod look OK on quick look
- radiation pole leaning
- one guy anchor (north) pulled
- another guy turnbuckle was apart -- presumably unscrewed by wind/vibration
- adjusted 3rd (cast alumninum) turnbuckle to show some threads -- was at end of bolt
- drove 18-inch rebar at north anchor
- reset turnbuckle on SW guy
- rad pole firmly frozen/set in ground
- pushed (bent) pole to near-plumb
- radiometer mount failed with 2 lower ears bent, one cracked
- reset mount to level radiometer
- presume bear caused this damage
- snow depth height: 119 cm
- radiometer height: 119 cm