Difference between revisions of "SS To Do Next Visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 4: Line 4:
 
** https://catalog.orientalmotor.com/viewitems/mb-series-ac-centrifugal-fans-blowers/mb-series-50mm-centrifugal-fans-blowers
 
** https://catalog.orientalmotor.com/viewitems/mb-series-ac-centrifugal-fans-blowers/mb-series-50mm-centrifugal-fans-blowers
 
** I need to confirm that this unit is the correct one.  The one I took a picture of operates at 110VAC but I think some of the others operate at a lower voltage.
 
** I need to confirm that this unit is the correct one.  The one I took a picture of operates at 110VAC but I think some of the others operate at a lower voltage.
 +
** 7/6/18 yes all are 110VAC
 
* Deploy sensor refresh instruments from March.
 
* Deploy sensor refresh instruments from March.
 
** brought out 4pcs anemometers
 
** brought out 4pcs anemometers

Revision as of 19:56, 6 July 2018

2018

  • Replace tower aspirator fans:
  • Deploy sensor refresh instruments from March.
    • brought out 4pcs anemometers
  • Buy a new HMP155 for forest floor site
  • More PAR sensors and hardware for in-situ
  • Buy another SI-111 SDI12 model
  • Attend LI-COR training?
  • Polish Battery Backup System
  • replace Loggernet computer
  • Submit PRs for Summer 2018 Instrument Recalibrations
    • Vaisala HMP155s
    • MetOne 010C
    • Kipp & Zonen CNR4
  • Late Fall recalibrations: