===Publications List===
 +
* https://docs.google.com/document/d/1oWPf0fkpGD2vz_pspbcvLZecad_XLVn2EDaAP5bg3O4/edit?pli=1
  
 
===2018===
 
===2018===

Revision as of 12:36, 24 August 2018

Publications List

2018

Ss soil has room on c7 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.

  • need to extend the SI-421 I've located and then it is ready to deploy at forest floor radiation tower
    • will need to set SDI12 ID

Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.

  • Replace SR50A transducers
  • Dig second pit for soil instruments
  • clean up outdoor power cords
  • waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
  • I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
  • connect those shop power strips and get one more for inside?
  • SI111 install
  • buy and add more PAR top and bottom (4x and matching hardware)
  • add another tipping bucket.
  • panorama from tower for identifying horizon landmarks
  • bring solder out for ff atrh and electrical goo

Nearly end of summer status=

  • Get a handle on remaining budget
  • re-calibrate as many sensors as able
  • buy a couple more sensors as able
  • licor training if possible
  • write program for new soil pit box
    • soil moisture at 2+ depths
    • soil temp