Difference between revisions of "NGEE Teller SW Notes"
Jump to navigation
Jump to search
(Created page with "===Latest=== * Officially processed through 10/2017 * Partway through processing to 6/15. * hoping to establish stage/discharge curve in 2018 ===Stage 2016=== ===Stage 2017=...") |
|||
Line 6: | Line 6: | ||
===Stage 2016=== | ===Stage 2016=== | ||
+ | 8/13/2016 3:00 PTs offset | ||
+ | 9/14/2016 22:00 PT1 Position Reset & PT2 Removed | ||
===Stage 2017=== | ===Stage 2017=== | ||
+ | |||
+ | 4/1/2017 3:00 Station Turned back on, PT2 in place further downstream | ||
+ | 10/1/2017 20:00 PT2 Removed | ||
+ | 4/28/2017 1:50 shift in pt2? then | ||
===Stage 2018=== | ===Stage 2018=== | ||
− | + | ===Site Downloads / visits:=== | |
* Bob 4/21/2016 (CR1000) | * Bob 4/21/2016 (CR1000) | ||
* Lily 7/13/2016 (CR1000) | * Lily 7/13/2016 (CR1000) | ||
Line 20: | Line 26: | ||
* Bob 3/30/2018 | * Bob 3/30/2018 | ||
* Bob 6/13 & 15/2018 | * Bob 6/13 & 15/2018 | ||
+ | |||
+ | ===From Computer Notes=== | ||
+ | Need to put into a spreadsheet pressure transducer value / date / manual stage reading.... need to review notes. | ||
+ | |||
+ | Related: discharge measurements | ||
+ | Related: Get manual stage & discharge measurements into UTC time. | ||
+ | |||
+ | Then once that is complete can look at using | ||
+ | /var/site/uaf_sp/bin/teller_sw.sh | ||
+ | and the step utility function to correct everything to proper heights. | ||
+ | ...should think about gedit plug ins too to make it more like xed. | ||
+ | |||
+ | Original Google Doc: | ||
+ | * https://docs.google.com/spreadsheets/d/159Q7kFOTAE0pZyx2WgFBhe4qVnLEEM8diSVuSYGRkjE/edit#gid=1602029777 | ||
+ | Summary Google Doc: | ||
+ | * https://docs.google.com/spreadsheets/d/1gxLKzjoDvJkFmkDe0SVBhRRbokB-rvEpH77nN8cyLo0/edit#gid=1602029777 | ||
+ | |||
+ | |||
+ | 2/8: So.... including precip helps but there is still a period in september / october 2016 that confuses me with the diurnal signal looking more like air temperature driven. Emily and I sort of think that the heating of the cable might be playing a role here but I haven't looked too hard yet. |
Revision as of 13:19, 26 June 2018
Contents
Latest
- Officially processed through 10/2017
- Partway through processing to 6/15.
- hoping to establish stage/discharge curve in 2018
Stage 2016
8/13/2016 3:00 PTs offset 9/14/2016 22:00 PT1 Position Reset & PT2 Removed
Stage 2017
4/1/2017 3:00 Station Turned back on, PT2 in place further downstream 10/1/2017 20:00 PT2 Removed 4/28/2017 1:50 shift in pt2? then
Stage 2018
Site Downloads / visits:
- Bob 4/21/2016 (CR1000)
- Lily 7/13/2016 (CR1000)
- Bob/Lily 8/12/2016 (CR1000)
- Bob 9/14/2016
- Bob 4/1/2017
- Bob 5/2017
- Bob/Lily 10/1/2017
- Bob 3/30/2018
- Bob 6/13 & 15/2018
From Computer Notes
Need to put into a spreadsheet pressure transducer value / date / manual stage reading.... need to review notes.
Related: discharge measurements Related: Get manual stage & discharge measurements into UTC time.
Then once that is complete can look at using /var/site/uaf_sp/bin/teller_sw.sh and the step utility function to correct everything to proper heights. ...should think about gedit plug ins too to make it more like xed.
Original Google Doc:
Summary Google Doc:
2/8: So.... including precip helps but there is still a period in september / october 2016 that confuses me with the diurnal signal looking more like air temperature driven. Emily and I sort of think that the heating of the cable might be playing a role here but I haven't looked too hard yet.