Difference between revisions of "SS Site Visit 201-05-17 to 27"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
* computer maintenance on PEN Camera
 
* computer maintenance on PEN Camera
 
* computer maintenance on ss-lognet
 
* computer maintenance on ss-lognet
 +
* add arable
 +
* add soil pit 2
  
 
===To Do Yet===
 
===To Do Yet===

Revision as of 18:23, 25 May 2019

Fixes

  • Replace power cable connector for aspirators (animal chew)
  • replace LI7550 at forest floor
  • swap out tower top CNR4
  • computer maintenance on PEN Camera
  • computer maintenance on ss-lognet
  • add arable
  • add soil pit 2

To Do Yet

  • fix tower network cable
  • program mod for ss_met and ss_soil to output arable variables on the five minutes
  • program and wire up soil pit box