| Line 7: | Line 7: | ||
* add arable  | * add arable  | ||
* add soil pit 2  | * add soil pit 2  | ||
| + | * check the precip bucket... still good  | ||
| + | * program mod for ss_met and ss_soil to output arable variables on the five minutes  | ||
| + | * program and wire up soil pit box  | ||
| + | * retire old ss-main toughbook  | ||
| + | *   | ||
===To Do Yet===  | ===To Do Yet===  | ||
* fix tower network cable  | * fix tower network cable  | ||
| − | *   | + | * solder HMPcable  | 
| − | + | * figure out if smartflux2 at forest floor is properly configured.  | |
| − | *  | ||
Revision as of 11:41, 26 May 2019
Fixes
- Replace power cable connector for aspirators (animal chew)
 - replace LI7550 at forest floor
 - swap out tower top CNR4
 - computer maintenance on PEN Camera
 - computer maintenance on ss-lognet
 - add arable
 - add soil pit 2
 - check the precip bucket... still good
 - program mod for ss_met and ss_soil to output arable variables on the five minutes
 - program and wire up soil pit box
 - retire old ss-main toughbook
 
To Do Yet
- fix tower network cable
 - solder HMPcable
 - figure out if smartflux2 at forest floor is properly configured.