Difference between revisions of "SS Site Visit 201-05-17 to 27"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
* solder HMPcable | * solder HMPcable | ||
* figure out if smartflux2 at forest floor is properly configured. | * figure out if smartflux2 at forest floor is properly configured. | ||
+ | * network performance of tower toughbook |
Revision as of 11:42, 26 May 2019
Fixes
- Replace power cable connector for aspirators (animal chew)
- replace LI7550 at forest floor
- swap out tower top CNR4
- computer maintenance on PEN Camera
- computer maintenance on ss-lognet
- add arable
- add soil pit 2
- check the precip bucket... still good
- program mod for ss_met and ss_soil to output arable variables on the five minutes
- program and wire up soil pit box
- retire old ss-main toughbook
To Do Yet
- fix tower network cable
- solder HMPcable
- figure out if smartflux2 at forest floor is properly configured.
- network performance of tower toughbook