NGEE Project Disturbance / Kougarok focus.  Helping Go mostly.
 
NGEE Project Disturbance / Kougarok focus.  Helping Go mostly.
* Plan to visit all three Kougarok met stations...
+
* Tentatively plan to visit all three Kougarok met stations...if time
* Measure ground control at NGEE Koguarok mile 64 site
+
** Replace desiccant @ 10m tower
 +
** Replace CR10X @ 10m tower
 +
** Replace CR10X @ Mauze Gulch site
 +
** Replace snow transducers
 +
* Measure ground control at NGEE Koguarok mile 64 site (drop off GPS and pick up the next day)
 
* Thaw depth and subsidence survey
 
* Thaw depth and subsidence survey
 
* Measure creek flow at Teller mile 27 site
 
* Measure creek flow at Teller mile 27 site
(Most of this trip itinerary is beign driven by Go)
+
(Most of this trip itinerary is being driven by subsidence survey and drone work)
 +
 
 +
===August 27===
 +
* Fly into Nome in afternoon
 +
* rent truck and visit conex
 +
* Charge 12v batteries and yellow trimble batteries
 +
 
 +
===August 28===
 +
* Drive out to Kougarok and hope to stay in the airport cabin out there.
 +
* Full day of measurements.
 +
* setup Trimble station @ end of road for surveying
 +
 
 +
===August 29===
 +
* Full day at the site and then return in evening to Nome
 +
 
 +
===August 30===
 +
* On drive back to Kougarok deploy the base GPS at NGEE m64 GCP.
 +
* Full day at the site
 +
* camp in cabin again.
 +
 
 +
===August 31===
 +
* Partial day at site
 +
* Retrieve survey gps @ m64 site on drive back to Nome
 +
* pack up
 +
 
 +
===September 1===
 +
* Ship gear that needs to be sent out out.
 +
* hop on airplane and return to Anchorage / Fairbanks

Latest revision as of 09:27, 1 August 2021

NGEE Project Disturbance / Kougarok focus. Helping Go mostly.

  • Tentatively plan to visit all three Kougarok met stations...if time
    • Replace desiccant @ 10m tower
    • Replace CR10X @ 10m tower
    • Replace CR10X @ Mauze Gulch site
    • Replace snow transducers
  • Measure ground control at NGEE Koguarok mile 64 site (drop off GPS and pick up the next day)
  • Thaw depth and subsidence survey
  • Measure creek flow at Teller mile 27 site

(Most of this trip itinerary is being driven by subsidence survey and drone work)

August 27

  • Fly into Nome in afternoon
  • rent truck and visit conex
  • Charge 12v batteries and yellow trimble batteries

August 28

  • Drive out to Kougarok and hope to stay in the airport cabin out there.
  • Full day of measurements.
  • setup Trimble station @ end of road for surveying

August 29

  • Full day at the site and then return in evening to Nome

August 30

  • On drive back to Kougarok deploy the base GPS at NGEE m64 GCP.
  • Full day at the site
  • camp in cabin again.

August 31

  • Partial day at site
  • Retrieve survey gps @ m64 site on drive back to Nome
  • pack up

September 1

  • Ship gear that needs to be sent out out.
  • hop on airplane and return to Anchorage / Fairbanks