Difference between revisions of "Main Page"
Jump to navigation
Jump to search
imported>Eyoucha |
|||
Line 46: | Line 46: | ||
* [[Umiat/ADOT and USFWS Project May 2013 Field Trip]] Toolik Crew Logistics & Planning | * [[Umiat/ADOT and USFWS Project May 2013 Field Trip]] Toolik Crew Logistics & Planning | ||
* [[Umiat Project Station Inventories]] | * [[Umiat Project Station Inventories]] | ||
+ | * [[ADOT Project Toughbook Software List]] | ||
* [[Umiat May 2010 Field Trip]] Logistics Planning | * [[Umiat May 2010 Field Trip]] Logistics Planning | ||
* [[Umiat May 2011 Field Trip]] Planning | * [[Umiat May 2011 Field Trip]] Planning |
Revision as of 12:39, 26 April 2013
Contents
Water and Environmental Research Center Hydrologic Research Sites Wikipedia
This is a collaborative website for people involved with WERC's research stations, in any of several different projects:
Some Good Things to Know
- New Person in the department guide
- North Slope Training Procedures - Bullen/Foothills/Kuparuk projects
- Common Instrumentation links
- Software we use
- Troubleshooting sensors etc.
- Common Sensor Wiring
- Datalogger programming
- Laboratory Scale Logging Computer
- Field Safety
Field Notes and Procedures
- Making discharge measurements with ADCP
- Spring Stream Gauging Field Supplies Umiat Project Supplies List
- Winriver II Software for RDI ADCP Discharge Measurements
- Using the RDI StreamPro ADCP
- Using the RDI Rio Grande ADCP
- Bluetooth Communiciations for ADCP Discharge Measurements
- Using the Sontek RiverSurveyor S5 ADCP
- Quality Assurance/Control of ADCP Measurements
- Using the Sontek handheld ADP
- Using the Sontek Rivercat and Toughbook
- Using the Flo-Mate flow meter
- WERC Snow Survey Procedure
- Checking the TPS precipitation sensor.
- Trimble R8 Fast-Static Surveys
- A Thaw probe design
- Alternative to the Gieck Stand-- variable terrain rain gage stand
- Cheap tripod setup
- Using Isco 3700 Auto-Sampler
- Update a CR10X Operating System
- Add a scheduled task in windows
- Change an SDI Address
- RTK GPS Survey
- AR Parrot and remote robotics type stuff
Project Site Logs and To-Do lists
- Ambler/ADOT Project May 2013 Field Trip Bettles Crew Logistics & Planning
- Umiat/ADOT Project May 2013 Field Trip Umiat Crew Logistics & Planning
- Umiat/ADOT and USFWS Project May 2013 Field Trip Toolik Crew Logistics & Planning
- Umiat Project Station Inventories
- ADOT Project Toughbook Software List
- Umiat May 2010 Field Trip Logistics Planning
- Umiat May 2011 Field Trip Planning
- April 2010 Snow Survey Trip TO DO List
- all projects todo and site logs
- Sept 2009 Field Trip General ToDo List
- Sept 2008 Field Trip - Emily and Ken General ToDo List
- June 2008 Field Trip - Emily and Ken General ToDo List
- North Slope Kuparuk
- North Slope Bullen
- North Slope Foothills
- Seward Peninsula Sites
- Super-Site
- Jessie Cable & Bob Bolton EPSCOR in CPCRW project
- Barrow Soil Moisture Anna L's SM experiment in Barrow
- Chas Sites
- NGEE
- Pakbus IDs
WERC Field Books
Meta-topics on the use & setup of the WERC wiki
- editing wiki pages
- implementing site todo lists and logs