Difference between revisions of "Umiat May 2010 Field Trip"
Jump to navigation
Jump to search
imported>Eyoucha |
imported>Eyoucha |
||
Line 74: | Line 74: | ||
==Summary Field work To Do List == | ==Summary Field work To Do List == | ||
*Measure snowmelt discharge in Anaktuvuk River | *Measure snowmelt discharge in Anaktuvuk River | ||
− | *Improve existing (2009) [[Attach:Anak2009.jpg | Anaktuvuk Rating Curve]] Last Update: 3/29/10, EKY | + | *Improve existing (2009) [[Attach:Anak2009.jpg | Anaktuvuk Rating Curve]] (Last Update: 3/29/10, EKY) (i.e., stage/discharge relationship) for Anaktuvuk River gauging station |
*Evaluate/maintain and repair stations on Anaktuvuk, Itkillik, and Chandler rivers | *Evaluate/maintain and repair stations on Anaktuvuk, Itkillik, and Chandler rivers | ||
**Chandler Camera | **Chandler Camera |
Revision as of 09:26, 12 April 2010
Contents
Umiat May 2010 Logistics
This website helps me organize everything that needs to get done for the Umiat logistics May 2010.
(EKY Last Update 4/12/10)
Schedule
- April 12-17 Umiat Runway Plowed by UIC
- May 1 - BLM flight full
- May 4-7 ADCP/boating training, May 6 Sontek River Surveyor ADCP training event
- May 8-9 DOT plow runway?
- May 8-12 Richard to Umiat Daily BLM flights to Umiat, 1 UAF camp supplies flight 1 UAF staff flight 1 UAF equipment/gear flight?
- May 11 BLM fuel bladders set up (?)
- May 12 BLM fuel delivery (?)
- May 9-11 Horst Camp to Umiat 2 caravan flights mobilization
- May 11 or 12 UAF crew & Horst camp to Umiat (1 or 2 flights? Gear weight)
- May 19 Ken to Umiat, Bob to Prudhoe (Dave B. to Umiat w/ BLM). Resupply Horst camp.
- May 26 BLM Camp resupply flight (Bill Lee arrives)
- June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down
- June 5 2 flights for Horst crew demob to Fairbanks
Logistics To DO
- Book Wright Air Flights
- Coordinate flights w/ BLM Richard
- Assist with DEC permitting for Horst Camp as needed
- UIC Quote - Bill
- Horst camp weights (Josh Horst)
- UAF equip weights
- ADCP Q msmst cheat sheet Emily/Bob
- Trimble GPS set up cheat sheet (Bill Lee)
To DO for Field Prep
- Test ADCPs in river May 3-7
- River Surveyor ADCP/GPS set up and testing in river May 3-7
- Novatel GPS configuration files - Ken
- Trimble memory upgrade and battery cable - Emily/Ken
- Configure HOBO meters
- Survival kits put together
- Manuals/Guidance
Equipment/Supplies to Send to Umiat
- 1 drum unleaded fuel for boat motor and misc. use
- Spare Aquistar PTs
- HOBO PTs + data reader
- Wall tent supplies @ red door
- 3- 12V 100 a-h batteries (ADCP, Trimble GPS, spare)
- battery charger
- Trimble GPS and tripod
- ADCP Rio Grande
- ADCP River Surveyor
- Novatel GPS and wiring harnesses, config files
- Big Toughbook
- 2 radios
- 2 GPS tripods
- spare drybags
- life jackets (2 to Itkillik, 2 to Chandler)
- printer
- Disc weights for PTs
- Hose clamps
- sledgehammers
- rebar drive head
- level, survey tripod, rod
- backup hardrives
- flow tracker, rod, manuals
- binoculars
- laser rangefinder
- helo helmets
- Satellite phones (2)
- Shotguns + ammo (2)
- spare boat & motor parts
- survival/safety bags
- misc. stream gauging parts
- Manuals/Guidance
Summary Field work To Do List
- Measure snowmelt discharge in Anaktuvuk River
- Improve existing (2009) Anaktuvuk Rating Curve (Last Update: 3/29/10, EKY) (i.e., stage/discharge relationship) for Anaktuvuk River gauging station
- Evaluate/maintain and repair stations on Anaktuvuk, Itkillik, and Chandler rivers
- Chandler Camera
- Chandler PTs, Station
- Find new location for Chandler Station?
- Take basic hydrologic/ice observations for each river