Difference between revisions of "BRW March 2011 Visit"

From IARC 207 Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
Itinerary:<br>
+
== Itinerary:==
Departure:
+
=== Departure:===
Alaska Airlines 51      Fairbanks (FAI)
+
Alaska Airlines 51      Fairbanks (FAI)<br>
 
*6:12 pm * Thu, Mar 24  Barrow (BRW)
 
*6:12 pm * Thu, Mar 24  Barrow (BRW)
 
*7:36 pm *Thu, Mar 24  Coach *·* Boeing 737-400
 
*7:36 pm *Thu, Mar 24  Coach *·* Boeing 737-400
  
Friday 3/25:
+
=== Friday 3/25: ===
 
Stuff to bring:
 
Stuff to bring:
 
* Bob Toolbags
 
* Bob Toolbags
Line 23: Line 23:
 
* WERC Shotgun
 
* WERC Shotgun
  
Tasks:
+
===Tasks:===
 
* Download data off Storage Module
 
* Download data off Storage Module
 
* Download Data off Data logger
 
* Download Data off Data logger
Line 29: Line 29:
 
* Fix up solar wiring ''(make sure it looks decent, use butt splices to redo connections as needed)''
 
* Fix up solar wiring ''(make sure it looks decent, use butt splices to redo connections as needed)''
 
* Fix up battery leads ''(Use new ring connectors to firm up battery connections)''
 
* Fix up battery leads ''(Use new ring connectors to firm up battery connections)''
 +
 +
===Return:===
 +
Alaska Airlines 52      Barrow (BRW)
 +
*8:23 pm * Fri, Mar 25  Fairbanks (FAI)
 +
*9:42 pm *Fri, Mar 25  Coach *·* Boeing 737-400

Revision as of 12:11, 21 March 2011

Itinerary:

Departure:

Alaska Airlines 51 Fairbanks (FAI)

  • 6:12 pm * Thu, Mar 24 Barrow (BRW)
  • 7:36 pm *Thu, Mar 24 Coach *·* Boeing 737-400

Friday 3/25:

Stuff to bring:

  • Bob Toolbags
    • Ring Connectors
    • Butt Splices for solar setup
    • Crimping Tool
    • Voltmeter
    • electrical tape
    • rubber splicing tape
  • Toughbook, SC32B, Serial Cables
  • GPS & Batteries
  • Snow survey gear
    • Avalanche Probe
    • Adirondack Tube? No
    • Scale? No
    • Cloth Measuring Tape
  • WERC Shotgun

Tasks:

  • Download data off Storage Module
  • Download Data off Data logger
  • Measure snow depths
  • Fix up solar wiring (make sure it looks decent, use butt splices to redo connections as needed)
  • Fix up battery leads (Use new ring connectors to firm up battery connections)

Return:

Alaska Airlines 52 Barrow (BRW)

  • 8:23 pm * Fri, Mar 25 Fairbanks (FAI)
  • 9:42 pm *Fri, Mar 25 Coach *·* Boeing 737-400