Difference between revisions of "Inside Box"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
# wire up logger to mux | # wire up logger to mux | ||
# run power wire to battery | # run power wire to battery | ||
− | # install fuse holder & extra fuses | + | # install fuse holder & extra fuses (1 for sap, 1 for logger) |
+ | |||
+ | ====Yet To Do==== | ||
+ | * Mount a terminal strip to the wood | ||
+ | + run power from the strip to the logger & the sap flow module | ||
+ | + add connectors to the solar panel charge controller line | ||
+ | + drill holes in the clear box for the cables to come in. | ||
+ | ++ 5 sap flow | ||
+ | ++ 2 CS616 (SM) | ||
+ | ++ 2 107 (STemp) | ||
+ | ++ 1 Precip | ||
+ | ++ 1 HMP45C (AT/RH) | ||
+ | ++ 2 Power | ||
+ | + |
Revision as of 14:47, 1 April 2011
Tools:
- CSI Screw driver
- crimping tool
- Wire snips
The Plan
- mount the instrumentation to inside the clear tote.
- secure to wood with screws
- wire up logger to mux
- run power wire to battery
- install fuse holder & extra fuses (1 for sap, 1 for logger)
Yet To Do
- Mount a terminal strip to the wood
+ run power from the strip to the logger & the sap flow module + add connectors to the solar panel charge controller line + drill holes in the clear box for the cables to come in. ++ 5 sap flow ++ 2 CS616 (SM) ++ 2 107 (STemp) ++ 1 Precip ++ 1 HMP45C (AT/RH) ++ 2 Power +