Difference between revisions of "Toolik DOT 2011-05-21"

From IARC 207 Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
 
===Coordinates===
 
===Coordinates===
 
Itkillik Station -- Lat: 68 51.991,  Lon: -150 2.400,  Elev: 458 meters (1504 feet)<br/>  
 
Itkillik Station -- Lat: 68 51.991,  Lon: -150 2.400,  Elev: 458 meters (1504 feet)<br/>  
Northern Extent of Open Water -- Lat: N68 40,331,    Lon: -149 50.279<br/>
 
PlantCam -- Lat:  N68 54.757,  Lon: -150 05.697<br/>
 
 
Hobo #2 -- Lat: N68 52 13.1",  Lon: - 150 02 59.2"<br/>
 
Hobo #2 -- Lat: N68 52 13.1",  Lon: - 150 02 59.2"<br/>
 
Hobo #3 -- Lat: N68 52 44.72",  Lon: -150 03 57.63"<br/>
 
Hobo #3 -- Lat: N68 52 44.72",  Lon: -150 03 57.63"<br/>
Probable Peak Flow Gaging Location -- Lat: N68
 
  
 
===ADCP Specific===
 
===ADCP Specific===
 
* 1/4 mile from station = station 2
 
* 1/4 mile from station = station 2
 +
* Bridge = station 3
 
* Mag var = 20* 47' E
 
* Mag var = 20* 47' E
 
* Firmware should be 31.12
 
* Firmware should be 31.12
Line 23: Line 21:
 
* ADCP & other related instruments in trailer
 
* ADCP & other related instruments in trailer
 
* 5horse gas tank
 
* 5horse gas tank
 +
* PVC pipe
  
 
====Hobo 3====
 
====Hobo 3====
Line 45: Line 44:
 
* ADCP Measurement
 
* ADCP Measurement
 
** Sediment sample mid-river during measurement
 
** Sediment sample mid-river during measurement
<pre>For the mid river sampling, you should use a plastic bottle and get a grab sample during the discharge measurement (i.e., just one sample per day). Just put the bottle as deep as you can (with your hands) and collect the water. Please write the time.  </pre>
+
For the mid river sampling, you should use a plastic bottle  
 +
and get a grab sample during the discharge measurement (i.e.,  
 +
just one sample per day). Just put the bottle as deep as you can  
 +
(with your hands) and collect the water. Please write the time.   
 
* Set up Cataraft
 
* Set up Cataraft
 
* pound in screed stakes / rebar
 
* pound in screed stakes / rebar
 
* water level measurement
 
* water level measurement
 
* Setup isco:  
 
* Setup isco:  
<pre>I believe you guys will focus your activities near the crossing. I suggest to put the ISCO there too. You should try to fix the end of the tube (where the water enters the tube) to a rebar. The rebar could be near the bank (as long as it is located in moving waters).  We don't want to capture any bed sediment. Any distance above 30 cm from the bottom (river bed) and 20 cm below the top (water surface) would work. Set the sampler to take 4 samples per day. You should collect samples at 3 AM, 9AM, 3 PM and 9 PM (four in a day). </pre>
+
I believe you guys will focus your activities near the crossing. I suggest  
 +
to put the ISCO there too. You should try to fix the end of the tube (where  
 +
the water enters the tube) to a rebar. The rebar could be near the bank (as  
 +
long as it is located in moving waters).  We don't want to capture any bed  
 +
sediment. Any distance above 30 cm from the bottom (river bed) and 20 cm below  
 +
the top (water surface) would work. Set the sampler to take 4 samples per day.  
 +
You should collect samples at 3 AM, 9AM, 3 PM and 9 PM (four in a day).
  
 
===Tools===
 
===Tools===

Latest revision as of 08:34, 21 May 2011

Coordinates

Itkillik Station -- Lat: 68 51.991, Lon: -150 2.400, Elev: 458 meters (1504 feet)
Hobo #2 -- Lat: N68 52 13.1", Lon: - 150 02 59.2"
Hobo #3 -- Lat: N68 52 44.72", Lon: -150 03 57.63"

ADCP Specific

  • 1/4 mile from station = station 2
  • Bridge = station 3
  • Mag var = 20* 47' E
  • Firmware should be 31.12
  • Boat GPS computer connects to the serial port (not usb)

Tasks

Toolik Prep

  • More PT rebars for water measurements
  • bring memory card for plant cam
  • bring out bubble level for surveying again
  • get survey gear from Joel (re: our broken rod)
  • extra hardware for cataraft
  • ADCP & other related instruments in trailer
  • 5horse gas tank
  • PVC pipe

Hobo 3

Move to bridge crossing

Itkillik Station

  • water level measurement
  • Snow Survey
    • Everything is on site
  • Surveying?
    • Everything is on site
  • GPS Survey GPS Master #1 Rebar #1 (& identify it with spray paint maybe?)
  • Paint top of culvert
  • Standard aerial pictures of gaging cross-section
  • Track down TSCe

Itkillik River Crossing

  • Standard aerial pictures @ Bridge crossing
    • Digital Camera
  • Plant Cam Setup
    • change out memory card
  • ADCP Measurement
    • Sediment sample mid-river during measurement
For the mid river sampling, you should use a plastic bottle 
and get a grab sample during the discharge measurement (i.e., 
just one sample per day). Just put the bottle as deep as you can 
(with your hands) and collect the water. Please write the time.  
  • Set up Cataraft
  • pound in screed stakes / rebar
  • water level measurement
  • Setup isco:
I believe you guys will focus your activities near the crossing. I suggest 
to put the ISCO there too. You should try to fix the end of the tube (where 
the water enters the tube) to a rebar. The rebar could be near the bank (as 
long as it is located in moving waters).  We don't want to capture any bed 
sediment. Any distance above 30 cm from the bottom (river bed) and 20 cm below 
the top (water surface) would work. Set the sampler to take 4 samples per day. 
You should collect samples at 3 AM, 9AM, 3 PM and 9 PM (four in a day).

Tools

  • Bob's toolbags (in helicopter)
  • Dry suits & boots
  • cordless drill
  • unbroken survey rod & tripod
  • survey tripod at Kanex or in Lab4
  • sledge (in helicopter)

Things to do yet in Toolik

  • Follow up on Ken's email about other station work
  • Continue Daily Computer Backups
  • Umiat Send list:
    • Trimble Setup
    • Trimble Tripod
    • 50W solar panel
    • unistrut
    • quarter inch bolts (short)
  • Staff gauges