Difference between revisions of "Toolik DOT 2011-05-31"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
## any hand tools like shovels etc. left on site | ## any hand tools like shovels etc. left on site | ||
## anything else that doesn't belong | ## anything else that doesn't belong | ||
+ | # Final Dye Drop | ||
====@Bridge Crossing==== | ====@Bridge Crossing==== |
Revision as of 21:49, 30 May 2011
Contents
Activities List
@Station
- Reset PTs
- Tape downs before & after
- Pack up the remaining odds and ends
- Pump
- Garbage cans for dye stuff
- any hand tools like shovels etc. left on site
- anything else that doesn't belong
- Final Dye Drop
@Bridge Crossing
- Reset Hobo
- Survey after
- Reset Isco Sampler
- change out sampling bottles
- Final ADCP measurement
- Pack stuff to send to Toolik
- Deflate Cataraft
Stuff for Toolik
- Boat motors
- achilles
- Gas
- GPS / Radio / tripod
- shotgun
- sledge hammer
- Plan B setup
- Excess pipe
Stuff to stay with the culvert
- 1 actionpacker of sediment bottles
- Sleeping Bags action packer
- River Safety stuff
- Cataraft