Activities List
@Station
- Reset PTs
- Tape downs before & after
- Pack up the remaining odds and ends
- Pump
- Garbage cans for dye stuff
- any hand tools like shovels etc. left on site
- anything else that doesn't belong
- Final Dye Drop
@Bridge Crossing
- Reset Hobo
- Survey after
- Reset Isco Sampler
- change out sampling bottles
- Final ADCP measurement
- Pack stuff to send to Toolik
- Deflate Cataraft
- Final Dye Sampling
Stuff for Toolik
- Boat motors
- achilles
- Gas
- GPS / Radio / tripod
- shotgun
- sledge hammer
- Plan B setup
- Excess pipe
Stuff to stay with the culvert
- 1 actionpacker of sediment bottles
- Sleeping Bags action packer
- River Safety stuff
- Cataraft