Difference between revisions of "Toolik DOT 2011-05-31"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 19: Line 19:
 
* Pack stuff to send to Toolik
 
* Pack stuff to send to Toolik
 
* Deflate Cataraft
 
* Deflate Cataraft
 
+
* Final Dye Sampling
  
 
====Stuff for Toolik====
 
====Stuff for Toolik====

Revision as of 21:50, 30 May 2011

Activities List

@Station

  1. Reset PTs
    1. Tape downs before & after
  2. Pack up the remaining odds and ends
    1. Pump
    2. Garbage cans for dye stuff
    3. any hand tools like shovels etc. left on site
    4. anything else that doesn't belong
  3. Final Dye Drop

@Bridge Crossing

  • Reset Hobo
    • Survey after
  • Reset Isco Sampler
    • change out sampling bottles
  • Final ADCP measurement
  • Pack stuff to send to Toolik
  • Deflate Cataraft
  • Final Dye Sampling

Stuff for Toolik

  • Boat motors
  • achilles
  • Gas
  • GPS / Radio / tripod
  • shotgun
  • sledge hammer
  • Plan B setup
  • Excess pipe


Stuff to stay with the culvert

  • 1 actionpacker of sediment bottles
  • Sleeping Bags action packer
  • River Safety stuff
  • Cataraft