| Line 1: | Line 1: | ||
===Notes===  | ===Notes===  | ||
* [[NGEE Barrow Intensive Sites Initial Wiring]]  | * [[NGEE Barrow Intensive Sites Initial Wiring]]  | ||
| − | * First Program: https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1  | + | * First Program (not including thermal offsets which will be added onsite):    | 
| + | ** https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1  | ||
| + | |||
| + | ===Metadata type stuff===  | ||
| + | * [[NGEE-Barrow Calibration and Serial Numbers]]  | ||
| + | * Timezone - UTC  | ||
| + | * PakBus IDs - A = 400; B = 401; C = 402; D = 403  | ||
| + | |||
| + | ===Supplies / Equipment the GIPL is providing to the project that will need to be replaced===  | ||
| + | * 4 Tripods  | ||
| + | * 4 CrossArms  | ||
| + | * 4 Radiation Shields  | ||
| + | * 4 107 Temperature Probes  | ||
| + | * 24 Thermal Conductivity sensors from East30  | ||
| + | * 8 Current Excitation Modules  | ||
| + | * 8 AM16/32 Multiplexers  | ||
| + | * 4 CR1000s  | ||
| + | * Instrument box  | ||
| + | * charge controller  | ||
| + | |||
| + | === Supplies / Equipment IARC is providing to the project that will need to be replaced===  | ||
| + | * Radios?  | ||
| + | ** set hopping channels to an alternate  | ||
| + | ** set up in multipoint mode  | ||
| + | * Power Cables?  | ||
| + | |||
| + | ===Enroute===  | ||
| + | * Battery Boxes should arrive 8/30ish  | ||
| + | * batteries I'm not sure of but should arrive near our departure.  | ||
| + | |||
| + | ===Program to do yet===  | ||
| + | * add radio on/off  | ||
| + | * seasonal snow measurements  | ||
| + | * low battery voltage checks before running thermal conductivity probes  | ||
| + | * test final program  | ||
| + | * add the thermal conductivity probes  | ||
===Pre-trip to do===  | ===Pre-trip to do===  | ||
| − | *   | + | * Cut Pipe  | 
| + | * Ship stuff: thinking two loads  | ||
| + | ** shipment 1 ship Wednesday and that will be stuff we'll need on arrival  | ||
| + | ** shipment 2 ship Friday and that will be things still being prepped early next week.  | ||
| + | * Organize per site items  | ||
| + | ** Precip Stand  | ||
| + | *** 3 screed stakes  | ||
| + | *** Pipe: 2 pcs 5 ft; 1 pcs 2.5'  | ||
| + | *** Hose Clamps (2 sizes)  | ||
| + | *** NuRail fittings (currently in Bob's office)  | ||
| + | ** Tripod Related  | ||
| + | *** 1 pcs tripod  | ||
| + | *** 1 pcs instrument box & contents:  | ||
| + | **** cable ties  | ||
| + | **** AM16/32s  | ||
| + | **** 2 pcs current excitation module  | ||
| + | **** 1 pcs CR1000  | ||
| + | **** 1 pcs radio & power cable  | ||
| + | **** 1 pcs radio antenna setup  | ||
| + | **** 1 pcs null modem  | ||
| + | *** Energy system  | ||
| + | **** 1 pcs solar panel  | ||
| + | **** 2 pcs ubolts for solar panel mount  | ||
| + | **** 2 pcs aluminum strips for solar panel mount  | ||
| + | **** 4 pcs nuts & bolts for solar panel mount  | ||
| + | **** Batteries if they arrive  | ||
| + | **** Ring connectors for batteries  | ||
| + | **** power cable to go between batteries  | ||
| + | **** power cable to go battery box to instrument box  | ||
| + | **** cable protection between battery box and instrument box  | ||
| + | **** power cable to go between solar panel and battery box  | ||
| + | **** cable protection to go between solar panel and battery box  | ||
| + | **** cold temperature power cable (red & black or an all-weather extension cord)  | ||
| + | **** 1 pcs power cable from solar panel  | ||
| + | **** 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)  | ||
| + | **** 1 pcs charge controller  | ||
| + | *** 1 pcs SR50A setup  | ||
| + | **** 5' x 3/4" Pipe  | ||
| + | **** SR50A setup  | ||
| + | **** 1 pcs SR50A  | ||
| + | **** 1 pcs SR50A mount  | ||
| + | **** 1 pcs SR50A cable  | ||
| + | **** 1 pcs SR50A cable protection  | ||
| + | *** Air Temperature Setup  | ||
| + | **** 1 pcs AT radiation shield  | ||
| + | **** 1 pcs 107 Temperature Probe  | ||
| + | **** 1 pcs cable protection  | ||
| + | *** Subsurface Hardware  | ||
| + | **** 9 HydraProbe IIs  | ||
| + | **** 3 HFP01 heat flux plates  | ||
| + | **** 5 deep thermistor probes  | ||
| + | **** 1 shallow thermistor probes  | ||
| + | **** 9 thermistors probes to pair with the hydraprobe iis  | ||
| + | **** 6 thermal conductivity probes to put two of the pits  | ||
===Things to buy===  | ===Things to buy===  | ||
* Bit o' Food?  | * Bit o' Food?  | ||
* buy additional required hardware  | * buy additional required hardware  | ||
| + | * 2400 ft of 3/4" flex conduit  | ||
| + | * 100 ft of 3/8" flex conduit  | ||
* brown tarps  | * brown tarps  | ||
* solar panel mounts  | * solar panel mounts  | ||
| Line 15: | Line 105: | ||
* large pvc and fittings to go between action packer and CSI enclosure?  | * large pvc and fittings to go between action packer and CSI enclosure?  | ||
* fittings for an additional opening in bottom of enclosures  | * fittings for an additional opening in bottom of enclosures  | ||
| + | * cable ties  | ||
===Stuff to bring out===  | ===Stuff to bring out===  | ||
==== Extras from Bill ====  | ==== Extras from Bill ====  | ||
* 4 pcs 107 Probes & Radiation Shields  | * 4 pcs 107 Probes & Radiation Shields  | ||
| + | |||
==== Other ====  | ==== Other ====  | ||
*    | *    | ||
| + | |||
| + | ==== things not on a PR yet====  | ||
| + | * power cables (reds & blacks or extension cords)  | ||
| + | * cable protection for energy system  | ||
| + | * brown tarps from Freddies  | ||
| + | * NRS straps maybe from the Beave for the tarp.  | ||
| + | * Cable Ties  | ||
==== Equipment To Ship ====  | ==== Equipment To Ship ====  | ||
| Line 36: | Line 135: | ||
* '''Shotgun'''  | * '''Shotgun'''  | ||
* Keypad  | * Keypad  | ||
| + | * fish tape  | ||
| + | * kayak   | ||
* Tool Bags    | * Tool Bags    | ||
* Computer & (packed) SC32B    | * Computer & (packed) SC32B    | ||
| Line 53: | Line 154: | ||
# Work Actionpacker #1 [Bob #3]  | # Work Actionpacker #1 [Bob #3]  | ||
#  | #  | ||
| + | |||
| + | ====How it will go down out there====  | ||
| + | * Bil & Vlad drill the thermistor bore holes  | ||
| + | * Bob focuses on the wiring and station set up with an assist as needed from others  | ||
| + | * Anna if she comes digs and logs soil pits  | ||
| + | * All will share hauling duties from truck to intensive site area  | ||
Revision as of 11:50, 24 August 2012
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
 - First Program (not including thermal offsets which will be added onsite):
 
Metadata type stuff
- NGEE-Barrow Calibration and Serial Numbers
 - Timezone - UTC
 - PakBus IDs - A = 400; B = 401; C = 402; D = 403
 
Supplies / Equipment the GIPL is providing to the project that will need to be replaced
- 4 Tripods
 - 4 CrossArms
 - 4 Radiation Shields
 - 4 107 Temperature Probes
 - 24 Thermal Conductivity sensors from East30
 - 8 Current Excitation Modules
 - 8 AM16/32 Multiplexers
 - 4 CR1000s
 - Instrument box
 - charge controller
 
Supplies / Equipment IARC is providing to the project that will need to be replaced
- Radios?
- set hopping channels to an alternate
 - set up in multipoint mode
 
 - Power Cables?
 
Enroute
- Battery Boxes should arrive 8/30ish
 - batteries I'm not sure of but should arrive near our departure.
 
Program to do yet
- add radio on/off
 - seasonal snow measurements
 - low battery voltage checks before running thermal conductivity probes
 - test final program
 - add the thermal conductivity probes
 
Pre-trip to do
- Cut Pipe
 - Ship stuff: thinking two loads
- shipment 1 ship Wednesday and that will be stuff we'll need on arrival
 - shipment 2 ship Friday and that will be things still being prepped early next week.
 
 - Organize per site items
- Precip Stand
- 3 screed stakes
 - Pipe: 2 pcs 5 ft; 1 pcs 2.5'
 - Hose Clamps (2 sizes)
 - NuRail fittings (currently in Bob's office)
 
 - Tripod Related
- 1 pcs tripod
 - 1 pcs instrument box & contents:
- cable ties
 - AM16/32s
 - 2 pcs current excitation module
 - 1 pcs CR1000
 - 1 pcs radio & power cable
 - 1 pcs radio antenna setup
 - 1 pcs null modem
 
 - Energy system
- 1 pcs solar panel
 - 2 pcs ubolts for solar panel mount
 - 2 pcs aluminum strips for solar panel mount
 - 4 pcs nuts & bolts for solar panel mount
 - Batteries if they arrive
 - Ring connectors for batteries
 - power cable to go between batteries
 - power cable to go battery box to instrument box
 - cable protection between battery box and instrument box
 - power cable to go between solar panel and battery box
 - cable protection to go between solar panel and battery box
 - cold temperature power cable (red & black or an all-weather extension cord)
 - 1 pcs power cable from solar panel
 - 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
 - 1 pcs charge controller
 
 - 1 pcs SR50A setup
- 5' x 3/4" Pipe
 - SR50A setup
 - 1 pcs SR50A
 - 1 pcs SR50A mount
 - 1 pcs SR50A cable
 - 1 pcs SR50A cable protection
 
 - Air Temperature Setup
- 1 pcs AT radiation shield
 - 1 pcs 107 Temperature Probe
 - 1 pcs cable protection
 
 - Subsurface Hardware
- 9 HydraProbe IIs
 - 3 HFP01 heat flux plates
 - 5 deep thermistor probes
 - 1 shallow thermistor probes
 - 9 thermistors probes to pair with the hydraprobe iis
 - 6 thermal conductivity probes to put two of the pits
 
 
 
 - Precip Stand
 
Things to buy
- Bit o' Food?
 - buy additional required hardware
 - 2400 ft of 3/4" flex conduit
 - 100 ft of 3/8" flex conduit
 - brown tarps
 - solar panel mounts
 - wiring stuff (to control all the excess wires) Action Packers?
 - conduit, lots!
 - large pvc and fittings to go between action packer and CSI enclosure?
 - fittings for an additional opening in bottom of enclosures
 - cable ties
 
Stuff to bring out
Extras from Bill
- 4 pcs 107 Probes & Radiation Shields
 
Other
things not on a PR yet
- power cables (reds & blacks or extension cords)
 - cable protection for energy system
 - brown tarps from Freddies
 - NRS straps maybe from the Beave for the tarp.
 - Cable Ties
 
Equipment To Ship
- 4 Tripods
 - 4 Battery Boxes
 - 4 Solar Panels
 - Thermistor Strings
 - Additional Thermistors
 - Radiation Shields
 - Instrument boxes with loggers etc. installed
 - charge controllers
 
Technical Gear
- Shotgun
 - Keypad
 - fish tape
 - kayak
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Climbing Gear Proper
 - Serial Cables & spares
 - brown tarps
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Shotgun [Bob #1]
 - Bob Personal backpack [Bob #2]
 - Work Actionpacker #1 [Bob #3]
 
How it will go down out there
- Bil & Vlad drill the thermistor bore holes
 - Bob focuses on the wiring and station set up with an assist as needed from others
 - Anna if she comes digs and logs soil pits
 - All will share hauling duties from truck to intensive site area