Difference between revisions of "NGEE September 3 2012 Trip"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
** '''NAC Waybill 345-2130-8431''' | ** '''NAC Waybill 345-2130-8431''' | ||
− | === | + | ===Bill Remaining things to grab=== |
− | * | + | * 2 pcs Null Modem cables |
− | * batteries | + | * Heat shrink |
+ | * Heat Gun | ||
+ | |||
+ | ===Bob Remaining things to grab=== | ||
+ | * 1 pcs SW12V Unit | ||
+ | * 4 pcs nuts & bolts for solar panel mount | ||
+ | * Grabbed, not packed | ||
+ | ** 5 pcs radio & power cable | ||
+ | ** 5 pcs radio antenna setup | ||
+ | ** 3 pcs null modem | ||
+ | ** Ring connectors for batteries | ||
+ | ** power cable to go between batteries | ||
+ | ** power cable to go battery box to instrument box | ||
+ | ** hole drilling stuff for liquid-tite | ||
+ | ** Multiplexer wiring wire | ||
− | === | + | ===To Purchase=== |
− | * | + | * NRS Straps for battery boxes |
− | |||
===Pre-trip to do=== | ===Pre-trip to do=== | ||
− | * | + | * Organized per site items ('''X''' means it's packed / shipped) |
− | + | ** Precip Stand | |
− | + | *** '''X''' 3 screed stakes | |
− | + | *** '''X''' Pipe: 2 pcs 5 ft; 1 pcs 2.5' | |
− | + | *** '''X''' Hose Clamps (2 sizes) | |
− | ** Precip Stand | + | *** '''X''' NuRail fittings |
− | *** 3 screed stakes | ||
− | *** Pipe: 2 pcs 5 ft; 1 pcs 2.5' | ||
− | *** Hose Clamps (2 sizes) | ||
− | *** NuRail fittings | ||
** Tripod Related | ** Tripod Related | ||
− | *** 1 pcs tripod | + | *** '''X''' 1 pcs tripod & cross arm |
− | *** 1 pcs instrument box & contents: | + | *** '''X''' 1 pcs instrument box & contents: |
− | **** cable ties | + | **** '''X''' cable ties |
− | **** AM16/32s | + | **** '''X''' 2pcs AM16/32s |
− | **** 2 pcs current excitation module | + | **** '''X''' 2 pcs current excitation module |
− | **** 1 pcs CR1000 | + | **** '''X''' 1 pcs CR1000 |
**** 1 pcs radio & power cable | **** 1 pcs radio & power cable | ||
**** 1 pcs radio antenna setup | **** 1 pcs radio antenna setup | ||
**** 1 pcs null modem | **** 1 pcs null modem | ||
*** Energy system | *** Energy system | ||
− | **** 1 pcs solar panel | + | **** '''X''' 1 pcs solar panel ''missing one'' |
− | **** 2 pcs ubolts for solar panel mount | + | **** '''X''' 2 pcs ubolts for solar panel mount |
− | **** 2 pcs aluminum strips for solar panel mount | + | **** '''X''' 2 pcs aluminum strips for solar panel mount ''shipped in 4' sections in one of the tripod boxes'' |
− | **** 4 pcs nuts & bolts for solar panel mount | + | **** 4 pcs nuts & bolts for solar panel mount ''need to grab yet'' |
− | **** Batteries | + | **** '''X''' Batteries |
**** Ring connectors for batteries | **** Ring connectors for batteries | ||
**** power cable to go between batteries | **** power cable to go between batteries | ||
Line 55: | Line 64: | ||
**** power cable to go between solar panel and battery box | **** power cable to go between solar panel and battery box | ||
**** cable protection to go between solar panel and battery box | **** cable protection to go between solar panel and battery box | ||
− | **** cold temperature power cable (red & black or an all-weather extension cord) | + | **** '''X''' cold temperature power cable (red & black or an all-weather extension cord) |
− | **** 1 pcs power cable from solar panel | + | **** '''X''' 1 pcs power cable from solar panel |
− | **** 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking) | + | **** '''X''' 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking) |
− | **** 1 pcs charge controller | + | **** '''X''' 1 pcs charge controller |
− | *** 1 pcs SR50A setup | + | *** '''X''' 1 pcs SR50A setup |
− | |||
**** SR50A setup | **** SR50A setup | ||
− | **** 1 pcs SR50A | + | **** '''X''' 1 pcs SR50A |
− | **** 1 pcs SR50A mount | + | **** '''X''' 1 pcs SR50A mount (in tripod box) |
− | **** 1 pcs SR50A cable | + | **** '''X''' 1 pcs SR50A cable |
− | **** 1 pcs SR50A cable protection | + | **** '''X''' 1 pcs SR50A cable protection |
*** Air Temperature Setup | *** Air Temperature Setup | ||
− | **** 1 pcs AT radiation shield | + | **** '''X''' 1 pcs AT radiation shield |
− | **** 1 pcs 107 Temperature Probe | + | **** '''X''' 1 pcs 107 Temperature Probe |
− | **** 1 pcs cable protection | + | **** '''X''' 1 pcs cable protection |
*** Subsurface Hardware | *** Subsurface Hardware | ||
− | **** 9 HydraProbe IIs | + | **** '''X''' 9 HydraProbe IIs |
− | **** 3 HFP01 heat flux plates | + | **** '''X''' 3 HFP01 heat flux plates |
− | **** 5 deep thermistor probes | + | **** '''X''' 5 deep thermistor probes |
− | **** 1 shallow thermistor probes | + | **** '''X''' 1 shallow thermistor probes |
− | **** 9 thermistors probes to pair with the hydraprobe iis | + | **** '''X''' 9 thermistors probes to pair with the hydraprobe iis |
− | **** 6 thermal conductivity probes to put two of the pits | + | **** '''X''' 6 thermal conductivity probes to put two of the pits |
===Things to buy=== | ===Things to buy=== | ||
* Bit o' Food? | * Bit o' Food? | ||
* buy additional required hardware | * buy additional required hardware | ||
− | |||
− | |||
− | |||
− | |||
* wiring stuff (to control all the excess wires) Action Packers? | * wiring stuff (to control all the excess wires) Action Packers? | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ==== | + | ===Stuff to bring=== |
− | |||
==== things not on a PR yet==== | ==== things not on a PR yet==== | ||
− | |||
− | |||
− | |||
* NRS straps maybe from the Beave for the tarp. | * NRS straps maybe from the Beave for the tarp. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==== Technical Gear ==== | ==== Technical Gear ==== | ||
Line 146: | Line 124: | ||
* Bil & Vlad drill the thermistor bore holes | * Bil & Vlad drill the thermistor bore holes | ||
* Bob focuses on the wiring and station set up with an assist as needed from others | * Bob focuses on the wiring and station set up with an assist as needed from others | ||
− | |||
* All will share hauling duties from truck to intensive site area | * All will share hauling duties from truck to intensive site area |
Revision as of 15:53, 29 August 2012
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- First Program (not including thermal offsets which will be added onsite):
- NGEE September 3 2012 Trip not essential to the trip information
Metadata type stuff
- NGEE-Barrow Calibration and Serial Numbers
- Timezone - UTC
* PakBus IDs - A = 400; B = 401; C = 402; D = 403
Shipping
- Tripods, battery boxes etc.
- NAC Waybill 345-2130-8372
- Batteries
- NAC Waybill 345-2130-8431
Bill Remaining things to grab
- 2 pcs Null Modem cables
- Heat shrink
- Heat Gun
Bob Remaining things to grab
- 1 pcs SW12V Unit
- 4 pcs nuts & bolts for solar panel mount
- Grabbed, not packed
- 5 pcs radio & power cable
- 5 pcs radio antenna setup
- 3 pcs null modem
- Ring connectors for batteries
- power cable to go between batteries
- power cable to go battery box to instrument box
- hole drilling stuff for liquid-tite
- Multiplexer wiring wire
To Purchase
- NRS Straps for battery boxes
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand
- X 3 screed stakes
- X Pipe: 2 pcs 5 ft; 1 pcs 2.5'
- X Hose Clamps (2 sizes)
- X NuRail fittings
- Tripod Related
- X 1 pcs tripod & cross arm
- X 1 pcs instrument box & contents:
- X cable ties
- X 2pcs AM16/32s
- X 2 pcs current excitation module
- X 1 pcs CR1000
- 1 pcs radio & power cable
- 1 pcs radio antenna setup
- 1 pcs null modem
- Energy system
- X 1 pcs solar panel missing one
- X 2 pcs ubolts for solar panel mount
- X 2 pcs aluminum strips for solar panel mount shipped in 4' sections in one of the tripod boxes
- 4 pcs nuts & bolts for solar panel mount need to grab yet
- X Batteries
- Ring connectors for batteries
- power cable to go between batteries
- power cable to go battery box to instrument box
- cable protection between battery box and instrument box
- power cable to go between solar panel and battery box
- cable protection to go between solar panel and battery box
- X cold temperature power cable (red & black or an all-weather extension cord)
- X 1 pcs power cable from solar panel
- X 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
- X 1 pcs charge controller
- X 1 pcs SR50A setup
- SR50A setup
- X 1 pcs SR50A
- X 1 pcs SR50A mount (in tripod box)
- X 1 pcs SR50A cable
- X 1 pcs SR50A cable protection
- Air Temperature Setup
- X 1 pcs AT radiation shield
- X 1 pcs 107 Temperature Probe
- X 1 pcs cable protection
- Subsurface Hardware
- X 9 HydraProbe IIs
- X 3 HFP01 heat flux plates
- X 5 deep thermistor probes
- X 1 shallow thermistor probes
- X 9 thermistors probes to pair with the hydraprobe iis
- X 6 thermal conductivity probes to put two of the pits
- Precip Stand
Things to buy
- Bit o' Food?
- buy additional required hardware
- wiring stuff (to control all the excess wires) Action Packers?
Stuff to bring
things not on a PR yet
- NRS straps maybe from the Beave for the tarp.
Technical Gear
- Shotgun
- Keypad
- fish tape
- kayak
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Climbing Gear Proper
- Serial Cables & spares
- brown tarps
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
How it will go down out there
- Bil & Vlad drill the thermistor bore holes
- Bob focuses on the wiring and station set up with an assist as needed from others
- All will share hauling duties from truck to intensive site area