Difference between revisions of "NGEE Barrow Intensive Sites Initial Wiring"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 1: | Line 1: | ||
| − | General Wiring 2013  | + | ===General Wiring 2013===  | 
| − | (  | + | (With some minor differences between sites:)  | 
| + | * 3 SR50As at site C  | ||
| + | * 1 CS106 at site A  | ||
  ' SE1  -- CNR4 SW In HI  |   ' SE1  -- CNR4 SW In HI  | ||
| Line 26: | Line 28: | ||
  ' P2 -- MetOne 3.5m WS+  |   ' P2 -- MetOne 3.5m WS+  | ||
| − |   ' C1 --   | + |   ' C1 -- AM16/32B #1 & AM16/32B #2 -- RES  | 
| − |   ' C2 --   | + |   ' C2 -- AM16/32B #3 -- RES; HMP155 CTRL; (optionally: CS106 CTRL)  | 
| − |   ' C3 --   | + |   ' C3 -- CNR4 Heater/Fan Control  | 
  ' C4 -- AM16/32B #1, 2, & 3 -- CLK  |   ' C4 -- AM16/32B #1, 2, & 3 -- CLK  | ||
| − |   ' C5 -- SDI 12 Devices   | + |   ' C5 -- SDI 12 Devices -- (6 Vitel Probes ) (Blue Wire); ; (2 SR50A ) (Green Wire)  | 
  ' C6 -- Vitel Probe CONTROL (Run to SW12V Control for Vitel Probes)  |   ' C6 -- Vitel Probe CONTROL (Run to SW12V Control for Vitel Probes)  | ||
| − |   ' C7 --   | + |   ' C7 -- TE525M Signal  | 
| − |   ' C8 --   | + |   ' C8 -- Thermal Conductivity Control  | 
  ' SW12V -- Radio Power  |   ' SW12V -- Radio Power  | ||
| − |   ' Wiring that will need to be moved   | + |   ' Wiring that will need to be moved in May 2013  | 
| − |   '   | + |   ' C1 -- Move AM16/32B #1 & #2 RES to here  | 
| − | |||
| − | |||
  ' Signal Ground -- HFP01 Shields (Clear Wire), 107 Probe SG (Purple Wire), SR50A    |   ' Signal Ground -- HFP01 Shields (Clear Wire), 107 Probe SG (Purple Wire), SR50A    | ||
| − | + | I think I'll need to make available some additional 12V & G power points.  Also... if I drop the SDM interface can I get everything into the original logger box??  Just adding more instruments plus a multiplexer all of a sudden.  | |
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
Revision as of 21:40, 21 April 2013
General Wiring 2013
(With some minor differences between sites:)
- 3 SR50As at site C
 - 1 CS106 at site A
 
' SE1 -- CNR4 SW In HI ' SE2 -- CNR4 SW In LO ' SE3 -- CNR4 SW OUT HI ' SE4 -- CNR4 SW OUT LO ' SE5 -- CNR4 LW IN HI ' SE6 -- CNR4 LW IN LO ' SE7 -- CNR4 Dome Temperature Signal ' SE8 -- 107 Probe Signal (Red Wire) ' SE9 -- CNR4 LW OUT HI ' SE10 -- CNR4 LW OUT LO ' SE11 -- AM16/32B #3 COM ODD HI ' SE12 -- AM16/32B #3 COM ODD LO ' SE13 -- AM16/32B #1 COM ODD HI, Precision Resistor to VX2 ' SE14 -- AM16/32B #1 COM ODD LO, Precision Resistor to VX2 ' SE15 -- AM16/32B #2 COM ODD HI, Precision Resistor to VX3 ' SE16 -- AM16/32B #2 COM ODD LO, Precision Resistor to VX3
' VX1 -- 107 Probe Excitation (Black Wire); **CNR4 LW Dome Temperature Excitation**, **RM Young WD Excite** ' VX2 -- Precision resistors to Mux 2 COM ODD HI, SE1, COM ODD LO, SE2 ' VX3 -- Precision resistors to Mux 3 COM ODD HI, SE1, COM ODD LO, SE2,
' P1 -- MetOne 1m WS+ ' P2 -- MetOne 3.5m WS+
' C1 -- AM16/32B #1 & AM16/32B #2 -- RES ' C2 -- AM16/32B #3 -- RES; HMP155 CTRL; (optionally: CS106 CTRL) ' C3 -- CNR4 Heater/Fan Control ' C4 -- AM16/32B #1, 2, & 3 -- CLK ' C5 -- SDI 12 Devices -- (6 Vitel Probes ) (Blue Wire); ; (2 SR50A ) (Green Wire) ' C6 -- Vitel Probe CONTROL (Run to SW12V Control for Vitel Probes) ' C7 -- TE525M Signal ' C8 -- Thermal Conductivity Control ' SW12V -- Radio Power
' Wiring that will need to be moved in May 2013 ' C1 -- Move AM16/32B #1 & #2 RES to here
' Signal Ground -- HFP01 Shields (Clear Wire), 107 Probe SG (Purple Wire), SR50A
I think I'll need to make available some additional 12V & G power points. Also... if I drop the SDM interface can I get everything into the original logger box?? Just adding more instruments plus a multiplexer all of a sudden.