Difference between revisions of "NGEE Barrow 2013 Boring Trip"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
* Toolbags | * Toolbags | ||
* replacement power supply for barrow dreamplug | * replacement power supply for barrow dreamplug | ||
+ | * new butane soldering iron in waterproof case | ||
+ | * solder? | ||
Barrow Tasks: | Barrow Tasks: |
Revision as of 17:32, 10 April 2013
...coring is more accurate than boring... not sure how that slipped through...
Stuff to do prior to:
- Understand how to do the stakeout method of RTK survey
- Can our R8s rx at 418mhz? ... yes. Need to get that setup.
- setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?
- check installed programs on barrow dreamplug
- load coring holes onto GPS
- scan fieldbook
Stuff to bring:
- Shotgun
- GPS setup
- Toughbook
- SC32B
- Serial Cables
- Toolbags
- replacement power supply for barrow dreamplug
- new butane soldering iron in waterproof case
- solder?
Barrow Tasks:
- Download Grid Soil Moisture Data
- Change power supply for dreamplug
- check out C site SR50A cables to see if they can be repaired etc.
- Check on Grid Battery