Difference between revisions of "NGEE Barrow 2013 Boring Trip"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 3: | Line 3: | ||
Stuff to do prior to:  | Stuff to do prior to:  | ||
* XX Understand how to do the stakeout method of RTK survey  | * XX Understand how to do the stakeout method of RTK survey  | ||
| − | * Can our R8s rx at 418mhz? ... yes.  Need to get that setup.  | + | * Can our R8s rx at 418mhz? ... yes.  Need to get that setup / just check up there for it.  | 
* setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?  | * setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?  | ||
* check installed programs on barrow dreamplug  | * check installed programs on barrow dreamplug  | ||
| + |  sudo dpkg -get-selections | grep -v deinstall > installed_packages-2012_07.txt  | ||
* XX load coring holes onto GPS  | * XX load coring holes onto GPS  | ||
* scan fieldbook  | * scan fieldbook  | ||
* Print this page and workplan from Dave  | * Print this page and workplan from Dave  | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
Barrow Tasks:  | Barrow Tasks:  | ||
| Line 46: | Line 17: | ||
* check out C site SR50A cables to see if they can be repaired etc.  | * check out C site SR50A cables to see if they can be repaired etc.  | ||
* Check on Grid Battery  | * Check on Grid Battery  | ||
| + | |||
| + | Stuff to bring:  | ||
| + | * XX small toolbag  | ||
| + | * XX Shotgun  | ||
| + | * XX GPS setup  | ||
| + | * XX Toughbook & charger  | ||
| + | * XX Trimble Chargers (2)  | ||
| + | * XX SC32B  | ||
| + | * XX Serial Cables  | ||
| + | |||
| + | * XX new butane soldering iron in waterproof case  | ||
| + | * XX solder?  | ||
| + | * XX PPE:  | ||
| + | ** XX Helmets  | ||
| + | ** XX Hearing Protection  | ||
| + | ** XX Safety Glasses  | ||
Revision as of 20:16, 14 April 2013
...coring is more accurate than boring... not sure how that slipped through...
Stuff to do prior to:
- XX Understand how to do the stakeout method of RTK survey
 - Can our R8s rx at 418mhz? ... yes. Need to get that setup / just check up there for it.
 - setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?
 - check installed programs on barrow dreamplug
 
sudo dpkg -get-selections | grep -v deinstall > installed_packages-2012_07.txt
- XX load coring holes onto GPS
 - scan fieldbook
 - Print this page and workplan from Dave
 
Barrow Tasks:
- Download Grid Soil Moisture Data
 - Change power supply for dreamplug
 - check out C site SR50A cables to see if they can be repaired etc.
 - Check on Grid Battery
 
Stuff to bring:
- XX small toolbag
 - XX Shotgun
 - XX GPS setup
 - XX Toughbook & charger
 - XX Trimble Chargers (2)
 - XX SC32B
 - XX Serial Cables
 
- XX new butane soldering iron in waterproof case
 - XX solder?
 - XX PPE:
- XX Helmets
 - XX Hearing Protection
 - XX Safety Glasses