Difference between revisions of "NGEE Barrow 2013 Site Install Trip"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c]) | * Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c]) | ||
* Timezone - UTC | * Timezone - UTC | ||
− | + | * PakBus IDs - A = 400; B = 401; C = 402; D = 403 | |
===Shipping=== | ===Shipping=== | ||
− | * New Instrumentation once it arrives | + | * New Instrumentation once it arrives: |
** Precip Buckets 3x | ** Precip Buckets 3x | ||
** Wind Screen 3x | ** Wind Screen 3x | ||
− | ** | + | ** HMP155s 6x |
+ | ** MetOne 6x | ||
+ | ** Barometric Pressure | ||
+ | ** Leg Mount Instrument Boxes 3x | ||
+ | *** Install AM16/32B if time | ||
+ | *** Install SDM Switch if time | ||
+ | ** Radiation Shields | ||
+ | ** Cross Arms | ||
+ | *** 1.5" Sched 40 Aluminum = Net Radiometer 3x | ||
+ | *** 1" Sched 40 Aluminum = Upper WS & AT/RH 3x | ||
+ | ** Tripod Mast | ||
+ | *** 1.5" Sched 40 Galvanized Pipe | ||
+ | |||
+ | |||
===To Do as of 4/10/2013=== | ===To Do as of 4/10/2013=== | ||
Line 23: | Line 36: | ||
* Sketch up site | * Sketch up site | ||
* Wire up boxes as much as possible (is anything possible? Maybe just mount the peripherals) | * Wire up boxes as much as possible (is anything possible? Maybe just mount the peripherals) | ||
+ | * cut crossarms to length | ||
=== Remaining things to grab=== | === Remaining things to grab=== | ||
− | * | + | * ? |
===To Purchase=== | ===To Purchase=== | ||
− | * | + | * ? |
===Pre-trip to do=== | ===Pre-trip to do=== | ||
* Organized per site items ('''X''' means it's packed / shipped) | * Organized per site items ('''X''' means it's packed / shipped) | ||
− | ** Precip Stand | + | ** Precip Stand (3 sets) |
− | *** | + | *** 4 NuRail 3/4 offset cross pieces |
− | *** | + | *** 1 Novalynx Wind Screen |
− | *** | + | *** 1 TE525m & Cable |
− | + | ||
** Tripod Related | ** Tripod Related | ||
− | *** | + | *** |
− | *** | + | *** |
− | **** | + | **** |
− | **** | + | **** |
− | **** | + | **** |
− | **** | + | **** |
− | **** | + | **** |
− | **** | + | **** |
− | **** | + | **** |
− | + | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Things to buy=== | ===Things to buy=== | ||
* Bit o' Food? | * Bit o' Food? | ||
− | * | + | * ? |
− | |||
===Stuff to bring=== | ===Stuff to bring=== | ||
Line 97: | Line 78: | ||
==== Technical Gear ==== | ==== Technical Gear ==== | ||
* '''Shotgun''' | * '''Shotgun''' | ||
− | * | + | * Keypads |
− | * fish tape | + | * '''fish tape''' |
− | |||
* Tool Bags | * Tool Bags | ||
* Computer & (packed) SC32B | * Computer & (packed) SC32B | ||
Line 105: | Line 85: | ||
* Climbing Gear Proper | * Climbing Gear Proper | ||
* Serial Cables & spares | * Serial Cables & spares | ||
− | * | + | * Sawzall |
− | |||
* drill | * drill | ||
Line 118: | Line 97: | ||
# | # | ||
− | ==== | + | ====Rough on-site todo==== |
− | + | # Remove box & solar panel | |
− | + | # Measure from top of tripod base to cross arm... note in fieldbook | |
− | + | # Remove crossarm off tripod | |
+ | # unscrew center pole | ||
+ | # put 1.5" offset nurail fitting on new center pole | ||
+ | # attach new center pole | ||
+ | # put cross arm, instrument box, and solar panel back on the tower. | ||
+ | # Install new instrument box on lower leg. | ||
+ | # Mount all new sensors | ||
+ | ## Net Radiometer @ 1-1.5m | ||
+ | ## WS on radiometer crossarm | ||
+ | ## HMP155 on radiometer crossarm | ||
+ | ## Second HMP155 & WS high up on tower, maybe as high as they'll reach. | ||
+ | ## Armor all the cabling | ||
+ | ## Armor and install the precip bucket. | ||
+ | ## Install the precip wind screen | ||
+ | # send new program to data logger |
Revision as of 17:28, 10 April 2013
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring (Out of date for the 2013 Install at the moment)
- Programs :
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
- Thermistor Probe Calibrations ([1])
- Thermistor Strings and Triple Calibrations ([2])
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 403
Shipping
- New Instrumentation once it arrives:
- Precip Buckets 3x
- Wind Screen 3x
- HMP155s 6x
- MetOne 6x
- Barometric Pressure
- Leg Mount Instrument Boxes 3x
- Install AM16/32B if time
- Install SDM Switch if time
- Radiation Shields
- Cross Arms
- 1.5" Sched 40 Aluminum = Net Radiometer 3x
- 1" Sched 40 Aluminum = Upper WS & AT/RH 3x
- Tripod Mast
- 1.5" Sched 40 Galvanized Pipe
To Do as of 4/10/2013
- Modify Programs
- Wiring Diagrams
- PRs for freight
- Sketch up site
- Wire up boxes as much as possible (is anything possible? Maybe just mount the peripherals)
- cut crossarms to length
Remaining things to grab
- ?
To Purchase
- ?
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand (3 sets)
- 4 NuRail 3/4 offset cross pieces
- 1 Novalynx Wind Screen
- 1 TE525m & Cable
- Precip Stand (3 sets)
- Tripod Related
-
- Tripod Related
Things to buy
- Bit o' Food?
- ?
Stuff to bring
things not on a PR yet
Technical Gear
- Shotgun
- Keypads
- fish tape
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Climbing Gear Proper
- Serial Cables & spares
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
Rough on-site todo
- Remove box & solar panel
- Measure from top of tripod base to cross arm... note in fieldbook
- Remove crossarm off tripod
- unscrew center pole
- put 1.5" offset nurail fitting on new center pole
- attach new center pole
- put cross arm, instrument box, and solar panel back on the tower.
- Install new instrument box on lower leg.
- Mount all new sensors
- Net Radiometer @ 1-1.5m
- WS on radiometer crossarm
- HMP155 on radiometer crossarm
- Second HMP155 & WS high up on tower, maybe as high as they'll reach.
- Armor all the cabling
- Armor and install the precip bucket.
- Install the precip wind screen
- send new program to data logger