==May 2013 Trip==
 
==May 2013 Trip==
 
Purpose:  
 
Purpose:  
* Fix Grid Site station  
+
* Rewire Grid Site station with CR1000 & new multiplexers
 +
* Setup MD485s to get Grid online
 +
* reconfigure Site C CR1000 for act as a pakbus router
 
* Snow Surveys
 
* Snow Surveys
* Any other prep that's possible
+
* Any other prep that's possible for the June trip
 
+
* Bring back shotgun
 +
* slather anticorrosion goo on all 12V/G points?
  
 
===Shipping===
 
===Shipping===
 +
* None
  
 
===To Do as of 4/21/2013===
 
===To Do as of 4/21/2013===
Line 15: Line 19:
 
* cut crossarms to length
 
* cut crossarms to length
 
* Change SDI-12 IDs for SR50As
 
* Change SDI-12 IDs for SR50As
* Review Site C data... Look closely at SR50A data for precise failure dates.
+
 
 
** Reinforce grounding
 
** Reinforce grounding
 
* SM Grid rewiring?
 
* SM Grid rewiring?
 
+
*
  
 
=== Remaining things to grab===
 
=== Remaining things to grab===
Line 39: Line 43:
 
* Ziplocs
 
* Ziplocs
 
* GPS
 
* GPS
* If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip.
 
 
==== things not on a PR yet====
 
 
  
  
 
==== Technical Gear ====
 
==== Technical Gear ====
* '''Shotgun'''
+
* '''Shotgun''' -- in Barrow already
 
* Keypads
 
* Keypads
 
* '''fish tape'''
 
* '''fish tape'''
Line 60: Line 60:
  
 
==== Probable Luggage ====
 
==== Probable Luggage ====
# Shotgun [Bob #1]
+
# Bob Personal Actionpacker [Bob #1]
# Bob Personal backpack [Bob #2]
+
# Work Actionpacker #1 [Bob #2]
# Work Actionpacker #1 [Bob #3]
+
 
#
 
  
 
====Rough on-site todo====
 
====Rough on-site todo====

Revision as of 12:31, 4 May 2013

May 2013 Trip

Purpose:

  • Rewire Grid Site station with CR1000 & new multiplexers
  • Setup MD485s to get Grid online
  • reconfigure Site C CR1000 for act as a pakbus router
  • Snow Surveys
  • Any other prep that's possible for the June trip
  • Bring back shotgun
  • slather anticorrosion goo on all 12V/G points?

Shipping

  • None

To Do as of 4/21/2013

  • Modify Programs
  • Wiring Diagrams
  • PRs for freight
  • Sketch up site
  • cut crossarms to length
  • Change SDI-12 IDs for SR50As
    • Reinforce grounding
  • SM Grid rewiring?

Remaining things to grab

  •  ?

To Purchase

  •  ?

Pre-trip to do

Things to buy

  • Bit o' Food?
  •  ?

Stuff to bring

  • Adirondack Tube
  • Scale
  • Thaw Probe
  • Ziplocs
  • GPS


Technical Gear

  • Shotgun -- in Barrow already
  • Keypads
  • fish tape
  • Tool Bags
  • Computer & (packed) SC32B
  • Climbing harness
  • Serial Cables & spares
  • Sawzall
  • drill

Food to bring out

  • Optional

Probable Luggage

  1. Bob Personal Actionpacker [Bob #1]
  2. Work Actionpacker #1 [Bob #2]


Rough on-site todo

  1. Copy wiring of Grid Site
  2. Transfer wires to new multiplexer & Logger
  3. Snowsurveys