Difference between revisions of "NGEE Barrow 2013 Site Install Trip"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 2: | Line 2: | ||
===Purpose: ===  | ===Purpose: ===  | ||
* Rewire Grid Site station with CR1000 & new multiplexers  | * Rewire Grid Site station with CR1000 & new multiplexers  | ||
| + | ** PakBus ID = 404   | ||
* Setup MD485s to get Grid online  | * Setup MD485s to get Grid online  | ||
* reconfigure Site C CR1000 for act as a pakbus router  | * reconfigure Site C CR1000 for act as a pakbus router  | ||
** Change IsRouter to YES -> Available in advanced settings  | ** Change IsRouter to YES -> Available in advanced settings  | ||
** Change beacon interval on SDC7 to 60  | ** Change beacon interval on SDC7 to 60  | ||
| − | |||
* Snow Surveys  | * Snow Surveys  | ||
* Any other prep that's possible for the June trip  | * Any other prep that's possible for the June trip  | ||
Revision as of 13:07, 6 May 2013
Contents
May 2013 Trip
Purpose:
- Rewire Grid Site station with CR1000 & new multiplexers
- PakBus ID = 404
 
 - Setup MD485s to get Grid online
 - reconfigure Site C CR1000 for act as a pakbus router
- Change IsRouter to YES -> Available in advanced settings
 - Change beacon interval on SDC7 to 60
 
 - Snow Surveys
 - Any other prep that's possible for the June trip
 - Bring back shotgun
 - slather anticorrosion goo on all 12V/G points?
 - Record Thermal Conductivity Heater Resistance using a high-accuracy ohmmeter
 - Swap out SR50A
 
Shipping
- None
 
To Purchase
- Anti-Corrosion Goo
 - Ziplocs
 - In Barrow:
- Butane
 
 - Food?
 
Pre-trip to do
- Read up on CR1000 Pakbus Routing
 - Pack
 
Stuff to bring
- Adirondack Tube
 - Scale
 - Thaw Probe
 - Ziplocs
 - GPS
 - 4 Precision Resistors for new logger
 - High Precision Voltmeter
 - Duct Seal
 - 80' of cable
 
Technical Gear
- Shotgun -- in Barrow already
 - Keypads
 - fish tape
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Serial Cables & spares
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Bob Personal Actionpacker [Bob #1]
 - Work Actionpacker #1 [Bob #2]
 
Rough on-site todo
- Copy wiring of Grid Site
 - Transfer wires to new multiplexer & Logger
 - Snowsurveys
 - Measure Heater Resistances for all thermal conductivity probes
 - Look to see if the C site pit 2 thermal conductivity sensors could be connected to a lower instrument enclosure.
 - configure C as pakbus router for grid
 - armor and run rs485 line between C and grid