Difference between revisions of "NGEE Barrow 2013 Site Install Trip 2"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
*** #2 = ID8 | *** #2 = ID8 | ||
*** #3 = ID9 | *** #3 = ID9 | ||
+ | * Also Measure Thermal Conductivity Heater Values | ||
+ | |||
===To Do as of 4/21/2013=== | ===To Do as of 4/21/2013=== |
Revision as of 14:42, 4 May 2013
Contents
June 2013 Trip
Shipping
- New Instrumentation once it arrives on 5/26ish:
- Precip Buckets 3x
- Wind Screen 3x
- HMP155s 6x
- MetOne 5x
- Barometric Pressure
- Radiation Shields
- Cross Arms
- 1.5" Sched 40 Aluminum = Net Radiometer 3x
- 1" Sched 40 Aluminum = Upper WS & AT/RH 3x
- Tripod Mast
- 1.5" Sched 40 Galvanized Pipe
- Net Radiometer
- NuRail Fittings for crossarms
To Add to each site
- 2 HMP155s w/ Radiation Shields
- 2 Met One WS
- 1 Tipping Bucket w/ Windscreen
- 1 CNR4 Net Radiometer with Heater/Fan Control
- 1 AM16/32
Additionally, to add to Site A
- CS106 Barometric Pressure
Rewiring at each site
- Move AM16/32B #1 & #2 RES to CR1000 C1
- Move SR50A Green Wire to CR1000 C5
- Reprogram the IDs for the SR50As
- #1 = ID7
- #2 = ID8
- #3 = ID9
- Reprogram the IDs for the SR50As
- Also Measure Thermal Conductivity Heater Values
To Do as of 4/21/2013
- Modify Programs
- Wiring Diagrams
- PRs for freight
- Sketch up site
- Wire up boxes as much as possible (is anything possible? Maybe just mount the peripherals)
- Review pictures to see if a second box is still needed for just the multiplexer.
- holes in box for instrumentation maybe?
- cut crossarms to length
- Change SDI-12 IDs for SR50As
- Review Site C data... Look closely at SR50A data for precise failure dates.
- SM Grid rewiring?
Remaining things to grab
- ?
To Purchase
- ?
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand (3 sets)
- 4 NuRail 3/4 offset cross pieces
- 1 Novalynx Wind Screen
- 1 TE525m & Cable
- Precip Stand (3 sets)
- Tripod Related
-
- Tripod Related
Things to buy
- Bit o' Food?
- ?
Stuff to bring
things not on a PR yet
Technical Gear
- Shotgun
- Keypads
- fish tape
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Serial Cables & spares
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
Rough on-site todo
- Remove box & solar panel
- Measure from top of tripod base to cross arm... note in fieldbook
- Remove crossarm off tripod
- unscrew center pole
- put 1.5" offset nurail fitting on new center pole
- attach new center pole
- put cross arm, instrument box, and solar panel back on the tower.
- Install new instrument box on lower leg.
- Mount all new sensors
- Net Radiometer @ 1-1.5m
- WS on radiometer crossarm
- HMP155 on radiometer crossarm
- Second HMP155 & WS high up on tower, maybe as high as they'll reach.
- Armor all the cabling
- Armor and install the precip bucket.
- Install the precip wind screen
- send new program to data logger