| Line 6: | Line 6: | ||
** Wind Screen 3x  | ** Wind Screen 3x  | ||
** HMP155s 6x  | ** HMP155s 6x  | ||
| − | ** MetOne   | + | ** MetOne 6x  | 
** Barometric Pressure  | ** Barometric Pressure  | ||
** Radiation Shields  | ** Radiation Shields  | ||
| − | ** Cross Arms    | + | ** Cross Arms & Mounts  | 
*** 1.5" Sched 40 Aluminum = Net Radiometer 3x  | *** 1.5" Sched 40 Aluminum = Net Radiometer 3x  | ||
*** 1" Sched 40 Aluminum = Upper WS & AT/RH 3x  | *** 1" Sched 40 Aluminum = Upper WS & AT/RH 3x  | ||
| Line 15: | Line 15: | ||
*** 1.5" Sched 40 Galvanized Pipe  | *** 1.5" Sched 40 Galvanized Pipe  | ||
** Net Radiometer  | ** Net Radiometer  | ||
| + | *** Fan/Heater is in Barrow  | ||
** NuRail Fittings for crossarms  | ** NuRail Fittings for crossarms  | ||
| Line 22: | Line 23: | ||
* 1 Tipping Bucket w/ Windscreen  | * 1 Tipping Bucket w/ Windscreen  | ||
* 1 CNR4 Net Radiometer with Heater/Fan Control  | * 1 CNR4 Net Radiometer with Heater/Fan Control  | ||
| − | * 1 AM16/  | + | * 1 AM16/32B  | 
===Additionally, to add to Grid Site===  | ===Additionally, to add to Grid Site===  | ||
| Line 28: | Line 29: | ||
** Need to dig out a vent tube  | ** Need to dig out a vent tube  | ||
** Bring up parts to put a new hole in this enclosure  | ** Bring up parts to put a new hole in this enclosure  | ||
| + | |||
===Rewiring at each site===  | ===Rewiring at each site===  | ||
* Move AM16/32B #1 & #2 RES to CR1000 C1  | * Move AM16/32B #1 & #2 RES to CR1000 C1  | ||
Revision as of 13:30, 10 June 2013
Contents
June 2013 Trip
Shipping
- New Instrumentation once it arrives on 5/26ish:
- Precip Buckets 3x
 - Wind Screen 3x
 - HMP155s 6x
 - MetOne 6x
 - Barometric Pressure
 - Radiation Shields
 - Cross Arms & Mounts
- 1.5" Sched 40 Aluminum = Net Radiometer 3x
 - 1" Sched 40 Aluminum = Upper WS & AT/RH 3x
 
 - Tripod Mast
- 1.5" Sched 40 Galvanized Pipe
 
 - Net Radiometer
- Fan/Heater is in Barrow
 
 - NuRail Fittings for crossarms
 
 
To Add to each site
- 2 HMP155s w/ Radiation Shields
 - 2 Met One WS
 - 1 Tipping Bucket w/ Windscreen
 - 1 CNR4 Net Radiometer with Heater/Fan Control
 - 1 AM16/32B
 
Additionally, to add to Grid Site
- CS106 Barometric Pressure
- Need to dig out a vent tube
 - Bring up parts to put a new hole in this enclosure
 
 
Rewiring at each site
- Move AM16/32B #1 & #2 RES to CR1000 C1
 - Move SR50A Green Wire to CR1000 C5
- Reprogram the IDs for the SR50As
- #1 = ID7
 - #2 = ID8
 - #3 = ID9
 
 
 - Reprogram the IDs for the SR50As
 - Also Measure Thermal Conductivity Heater Values
 - Bring up 3 resistors for CNR4 Thermistor measurement
 
To Do as of 6/8/2013
- Wiring Diagrams
 - Sketch up site
 - holes in box for instrumentation maybe?
 - cut crossarms to length (in Barrow)
 - Change SDI-12 IDs for SR50As (in Barrow)
 - Copy B program additions to A & C
 
Remaining things to grab
- XXX Nu Rail oddball connectors from cabinet
 - BP tubing for grid site
 - Cord Grips for grid site
 - silicone for grid site
 
To Purchase
- More Flexible Conduit
 - Vent Tube
 
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand  (3 sets)
- XX 4 NuRail 3/4 offset cross pieces
 - XX 1 Novalynx Wind Screen
 - XX 1 TE525m & Cable
 
 
 - Precip Stand  (3 sets)
 
- Tripod Related
- XX 1.5" Aluminium cross arm for CNR4, lower AT/RH & WS
 - XX 1.5" Nurail offset
 - XX 1" Aluminum cross arm for upper AT/RH & WS
 - XX HMP155s, cables, Radiation Shield
 - XX 014a WS, cables, nurail / cross arm mounts
 - 
 
 
- Tripod Related
 
Things to buy
- Bit o' Food?
 - 1.5" Pipe Threader
 - Flex Conduit
 
Stuff to bring
Technical Gear
- Keypads
 - XX fish tape
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Serial Cables & spares
 - XX Sawzall
 - XX drill
 - Pipe Wrench
 - 1.5" Pipe Threader
 
Food to bring out
- Optional
 
Rough on-site todo (for each site)
- Measure from top of tripod base to cross arm... note in fieldbook
 - Remove box & solar panel from tripod mast
 - Remove existing crossarm off tripod
 - unscrew center pole
 - put 1.5" offset nurail fitting on new center pole
 - add top of tower cross arm with anemometer & HMP155
- Armor and secure these two cables
 
 - screw on the new center pole
 - put the existing cross arm, instrument box, and solar panel back on the tower.
 - Mount all new sensors
- On lowest crossarm, 1-1.5m above ground surface
- Net Radiometer
 - Cross Arm bracket
- Wind Speed
 
 - HMP155 on radiometer crossarm
 
 - Armor all the cabling lower cabling
 - Armor and install the precip bucket.
 - Install the precip wind screen
 
 - On lowest crossarm, 1-1.5m above ground surface
 - send new program to data logger
 
Idealized Rough Itinerary (with dates to float depending on how long things take)
I budgeted 2 days per site but I'm hoping 1 to 1.5 days is more realistic.
6/11
- Fly to Barrow
 - Sort Shipped Gear
 - Track down a sled
 - Organize stuff locally in Barrow
 - Quick trip to the sites if there is time
 - Look at D site box for parts (and prepare for shipment back to Fairbanks)
 
6/12
- Haul stuff out for A site
 - Add components to A site
 
6/13
- Haul stuff out for B site
 - Finish A site
 - Start B site
 
6/14
- Haul stuff out for C site
 - Finish B site
 - Start C site?
 
6/15
- Finish C site
 
6/16
- Ship stuff back to Fairbanks