Line 79: | Line 79: | ||
====Lower Itkillik Station==== | ====Lower Itkillik Station==== | ||
* <strike>Plant Cam</strike>: ''Installed 2013-05-23'' | * <strike>Plant Cam</strike>: ''Installed 2013-05-23'' | ||
− | * Needs freewave radio | + | * <strike>Needs freewave radio</strike> ''tentatively fixed 2013-05-26'' |
− | * Needs new program loaded into logger for water levels, turbidity, should be identical to Upper Itkillik except for no cameras. | + | * Needs new program loaded into logger for water levels, turbidity, should be identical to Upper Itkillik except for no cameras. ''reprogrammed except for turbidity which will be installed after breakup |
* Station has: | * Station has: | ||
** HMP, | ** HMP, | ||
Line 97: | Line 97: | ||
====Chandler Crossing==== | ====Chandler Crossing==== | ||
− | * Install Plant Cam | + | * <strike>Install Plant Cam</strike> |
====Chandler Gaging Site==== | ====Chandler Gaging Site==== | ||
− | * Install Hobo for backup | + | * Install <strike>Hobo for backup</strike> |
* Install PTs | * Install PTs | ||
** Record S/N | ** Record S/N | ||
** SDI Address | ** SDI Address | ||
** PSI Rating | ** PSI Rating | ||
− | * Survey in Benchmarks & TBMs | + | * <strike>Survey in Benchmarks & TBMs</strike> |
* Snow Survey | * Snow Survey | ||
Line 113: | Line 113: | ||
* Fix Cameras | * Fix Cameras | ||
** Bring Extra Cable & Camera to the site | ** Bring Extra Cable & Camera to the site | ||
− | ** | + | ** One camera working but untelemetered need to add second camera |
** | ** | ||
* Snow Survey | * Snow Survey | ||
Line 119: | Line 119: | ||
===Needed from Toolik=== | ===Needed from Toolik=== | ||
* Stakes for DUM efence charger | * Stakes for DUM efence charger | ||
− | * CC640 Power Plugs (6 conductor deals) | + | * CC640 Power Plugs (6 conductor deals, black) |
* <strike>Some Conduit</strike> | * <strike>Some Conduit</strike> | ||
− | * | + | * Crimp on connectors |
+ | * cr10x power plug? | ||
+ | * cr1000? | ||
+ | * compact flash card | ||
+ | * usb extender cable | ||
===Needed from Umiat=== | ===Needed from Umiat=== | ||
* BLM flight schedule | * BLM flight schedule | ||
− | * Return Plant Cams to Fairbanks ('''2''' units) | + | * <strike>Return Plant Cams to Fairbanks ('''2''' units)</strike> |
Revision as of 09:41, 27 May 2013
Contents
Met Sites and Repeaters
DBM1 Accomplishment Creek
- Lat: 68 24.696, Lon: -148 8.190, Elev: 1474.065 meters (4833 feet)
- Telemetry Problem?
- Battery was fine as of 4/28/2013 (last received communication date):
- Data
- Web Page
DUR6 Itmalakpak
- Lat: 68 18.383, Lon: -151 7.468, Elev: 1452 meters (4764 feet)
- Shovel out solar panel.
- Replace barometric pressure if time permits.
- Need a new e-fence charger.
- The lower line is not working but the top line is working.
- Data
- Web Page
- Web Cam
DUM3 Nanushuk
- Lat: 68 43.243, Lon: -150 30.212, Elev: 541 meters (1774 feet)
- Stakes needed to pin down efence charger
- Data
- Web Page
- Web Cam
DUM4 Tuluga Met
- Lat: 68 48.267, Lon: -151 32.633, Elev: 564 meters (1849 feet)
- Potential bear damage at station.
- Have not heard from station since late September.
- Need an E-Fence; Also new stand?:
- is sitting on the ground surface next to the southwestern fencepost - to the south of the raingauge, the mount is broken and the solar panel/battery is not working
- New Gieck Base & Alter Shield
- Level Precip Bucket
- Data
- Web Page
- Web Cam
DUM5 Encampment Met
- Lat: 68 17.190, Lon: -152 7.908, Elev: 1224 meters (4015 feet)
- Bear Fence Needs Repair
- Data
- Web Page
- Web Cam
DUM6 White Lake Met
- Lat: 68 21.774, Lon: -152 42.402, Elev: 1081 meters
- Tighten wiring on Air temp backup (GWS style)
- Data
- Web Page
- Web Cam
DUM7 Hat Box Mesa
- Lat: 68 45.242, Lon: -152 34.372, Elev: 689 meters (2259 feet)
- Put Conduit over Soil thermistor cable
- Data
- Web Page
- Web Cam
DFM2 White Hills Met
- Lat: 69 29.187, Lon: -149 49.284
- Needs major sensor repairs. Most of the sensors are bad.
- Would be good to get rainfall and air temperature but I propose probably not fixing the following broken sensors:
- needs a new anemometer (bad bearings),
- has a bad SR50 snow depth sensor old style
- Needs an HMP Air temp sensor or a new backup sensor
- Data
- Web Page
DFM4 Northwest Kuparuk Met
- Lat: 69 56.851, Lon: -149 55.014, Elev: 123.83 meters (406 feet)
- Check radiation shields, are sensors in the shield?
- Replace SR50 old style.
- Fence was in very poor shape on last trip to station.
- Data
- Web Page
Surface Water Stations
Lower Itkillik Station
Plant Cam: Installed 2013-05-23Needs freewave radiotentatively fixed 2013-05-26- Needs new program loaded into logger for water levels, turbidity, should be identical to Upper Itkillik except for no cameras. reprogrammed except for turbidity which will be installed after breakup
- Station has:
- HMP,
- 10KOhm resistor
- Battery box thermistor.
- Rig job radio set up: Left pins 2, 3, 5 plugged into Ken's serial connector deal and unplugged 1, 4, 6. Taped back up.
- Plugged in null modem to logger and unplugged power to logger for winter.
- Bad radio or bad connection.
- Snow Survey
DUS3 Chandler Bluff Met
- Leaning tower due to erosion problems.
- Measure the leaning SR50 snow depth sensor distance to snow surface and snow depth so we can possibly correct the bad data due to the leaning tower.
- Move mast onto new tripod base and patch up station best you can.
- Remeasure SR50 distances, etc.
Chandler Crossing
Install Plant Cam
Chandler Gaging Site
- Install
Hobo for backup - Install PTs
- Record S/N
- SDI Address
- PSI Rating
Survey in Benchmarks & TBMs- Snow Survey
DUS2 Anaktuvuk River
- Needs new soil thermistor string
- Needs new Gieck Base and alter shield
- Fix Cameras
- Bring Extra Cable & Camera to the site
- One camera working but untelemetered need to add second camera
- Snow Survey
Needed from Toolik
- Stakes for DUM efence charger
- CC640 Power Plugs (6 conductor deals, black)
Some Conduit- Crimp on connectors
- cr10x power plug?
- cr1000?
- compact flash card
- usb extender cable
Needed from Umiat
- BLM flight schedule
Return Plant Cams to Fairbanks (2 units)