Line 58: | Line 58: | ||
* 1/2" wrench (for ubolts) | * 1/2" wrench (for ubolts) | ||
* 7/16* wrench (for ubolts) | * 7/16* wrench (for ubolts) | ||
− | * a set of nut drivers | + | * a full set of nut drivers |
− | + | * | |
Line 65: | Line 65: | ||
* rope for gin pole | * rope for gin pole | ||
* electrical outlet inside the box? | * electrical outlet inside the box? | ||
+ | ** 4 gang | ||
* liquid-tite and hose clamps for strobe | * liquid-tite and hose clamps for strobe | ||
− | * purchase guy wires (3/16") | + | * flex conduit for power cord from tram |
+ | * 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction | ||
+ | * 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction) | ||
+ | * maybe 3/4" conduit for strobe... this will go in the center pole section | ||
+ | * purchase guy wires (3/16")... how much | ||
* 3 more screed stakes (for base) | * 3 more screed stakes (for base) | ||
+ | * expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes | ||
+ | * | ||
* 2 pins (for base) | * 2 pins (for base) | ||
* cable protection for power (if not in the storage) | * cable protection for power (if not in the storage) |
Revision as of 12:18, 5 May 2015
As to the Barrow trip:
- Need gear for Sina
- Need to find out how much cable protection is in storage... ask bryan
- radio for logger
Contents
Done list
DONE * reservations for Barrow lodging DONE * send program snippet to Sina for soil moisture probes
- reservations for air travel
- we will fly in on the evening of the 11th
To do items it'd be nice if Bryan could look into once in Barrow:
- identify conduit supply in storage
Rough Schdeule:
- fly up the 11th, arrive in the evening
- morning of the 12th, one person puts the base together at NARL
- in barrow grab a piece of trail mat to put under the tower
- two people head out to BEO to site tower and shovel snow
- use gps to site tower and guy points (so as to miss frozen LCP etc)
- third person brings tower and anchor to cake eater pull off
- afternoon of the 12th: tower is raised
- once we see how easy it is to lift we'll know how many people it takes to lift and drop
To Do:
- Purchase request for freight
- load high res imagery onto GPS so we can hit our points in the field
- Put together program for Sina
Supplies to bring / air cargo:
- Duct Seal for instrument box
- tower sections
- anchor sections
- screed stakes
- gin pole
- rope for gin pole
- instrument box for data logger (sounds like small is fine)
- camera cross arm
- IR camera cross arm
- radiation cross arm
- extension cord for power from tram
- soil moisture probes
- switch 12 volt deal for soil moisture probes
Tools:
- 2 pcs 3/4 inch wrench (for unistrut bolts)
- level
- tape measure
- 1/2" wrench (for ubolts)
- 7/16* wrench (for ubolts)
- a full set of nut drivers
To purchase yet:
- rope for gin pole
- electrical outlet inside the box?
- 4 gang
- liquid-tite and hose clamps for strobe
- flex conduit for power cord from tram
- 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction
- 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction)
- maybe 3/4" conduit for strobe... this will go in the center pole section
- purchase guy wires (3/16")... how much
- 3 more screed stakes (for base)
- expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes
- 2 pins (for base)
- cable protection for power (if not in the storage)