Line 2: | Line 2: | ||
* Need gear for Sina | * Need gear for Sina | ||
* Need to find out how much cable protection is in storage... ask bryan | * Need to find out how much cable protection is in storage... ask bryan | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* radio for logger | * radio for logger | ||
Line 13: | Line 7: | ||
DONE * reservations for Barrow lodging | DONE * reservations for Barrow lodging | ||
DONE * send program snippet to Sina for soil moisture probes | DONE * send program snippet to Sina for soil moisture probes | ||
− | * reservations for air travel | + | DONE * reservations for air travel |
* we will fly in on the evening of the 11th | * we will fly in on the evening of the 11th | ||
Line 36: | Line 30: | ||
* Put together program for Sina | * Put together program for Sina | ||
+ | ====To Bring on plane:=== | ||
+ | * Tools | ||
+ | * Trimble | ||
+ | * | ||
− | ====Supplies to | + | ====Supplies to Ship NAC:==== |
− | |||
* tower sections | * tower sections | ||
* anchor sections | * anchor sections | ||
* screed stakes | * screed stakes | ||
+ | * survey tripod | ||
+ | * survey rod | ||
* gin pole | * gin pole | ||
+ | * radiation cross arm | ||
+ | * camera cross arm | ||
+ | * Sledge Hammer | ||
+ | |||
+ | ==== Supplies to ship either NAC or AK Air ==== | ||
+ | * Instrument Box | ||
+ | * | ||
+ | * Duct Seal for instrument box | ||
* rope for gin pole | * rope for gin pole | ||
* instrument box for data logger (sounds like small is fine) | * instrument box for data logger (sounds like small is fine) | ||
* camera cross arm | * camera cross arm | ||
* IR camera cross arm | * IR camera cross arm | ||
− | * | + | |
− | * extension cord for power from tram | + | In office / storage yet: |
− | * soil moisture probes | + | ** extension cord for power from tram |
− | * switch 12 volt deal for soil moisture probes | + | ** extension cord for power to strobe |
+ | ** soil moisture probes | ||
+ | ** switch 12 volt deal for soil moisture probes | ||
+ | ** lg actionpacker or two | ||
Tools: | Tools: | ||
Line 59: | Line 69: | ||
* 7/16* wrench (for ubolts) | * 7/16* wrench (for ubolts) | ||
* a full set of nut drivers | * a full set of nut drivers | ||
+ | * electrical tape | ||
+ | * 8pcs wire nuts | ||
* | * | ||
To purchase yet: | To purchase yet: | ||
− | * rope for gin pole | + | * 60 ft rope for gin pole |
* electrical outlet inside the box? | * electrical outlet inside the box? | ||
** 4 gang | ** 4 gang | ||
+ | ** also another outlet | ||
+ | ** faceplate for outlets | ||
* liquid-tite and hose clamps for strobe | * liquid-tite and hose clamps for strobe | ||
* flex conduit for power cord from tram | * flex conduit for power cord from tram | ||
+ | * flex for power to strobe | ||
* 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction | * 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction | ||
* 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction) | * 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction) | ||
* maybe 3/4" conduit for strobe... this will go in the center pole section | * maybe 3/4" conduit for strobe... this will go in the center pole section | ||
− | * purchase guy wires (3/16")... how much | + | * purchase guy wires (3/16")... how much ... 6pcs x 40 ft |
− | |||
* expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes | * expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes | ||
− | |||
− | |||
* cable protection for power (if not in the storage) | * cable protection for power (if not in the storage) | ||
+ | * something to keep the unistrut from popping off the screed stakes | ||
+ | * reflector tape @ Lowes |
Revision as of 12:44, 5 May 2015
As to the Barrow trip:
- Need gear for Sina
- Need to find out how much cable protection is in storage... ask bryan
- radio for logger
Contents
Done list
DONE * reservations for Barrow lodging DONE * send program snippet to Sina for soil moisture probes DONE * reservations for air travel
- we will fly in on the evening of the 11th
To do items it'd be nice if Bryan could look into once in Barrow:
- identify conduit supply in storage
Rough Schdeule:
- fly up the 11th, arrive in the evening
- morning of the 12th, one person puts the base together at NARL
- in barrow grab a piece of trail mat to put under the tower
- two people head out to BEO to site tower and shovel snow
- use gps to site tower and guy points (so as to miss frozen LCP etc)
- third person brings tower and anchor to cake eater pull off
- afternoon of the 12th: tower is raised
- once we see how easy it is to lift we'll know how many people it takes to lift and drop
To Do:
- Purchase request for freight
- load high res imagery onto GPS so we can hit our points in the field
- Put together program for Sina
=To Bring on plane:
- Tools
- Trimble
Supplies to Ship NAC:
- tower sections
- anchor sections
- screed stakes
- survey tripod
- survey rod
- gin pole
- radiation cross arm
- camera cross arm
- Sledge Hammer
Supplies to ship either NAC or AK Air
- Instrument Box
- Duct Seal for instrument box
- rope for gin pole
- instrument box for data logger (sounds like small is fine)
- camera cross arm
- IR camera cross arm
In office / storage yet:
- extension cord for power from tram
- extension cord for power to strobe
- soil moisture probes
- switch 12 volt deal for soil moisture probes
- lg actionpacker or two
Tools:
- 2 pcs 3/4 inch wrench (for unistrut bolts)
- level
- tape measure
- 1/2" wrench (for ubolts)
- 7/16* wrench (for ubolts)
- a full set of nut drivers
- electrical tape
- 8pcs wire nuts
To purchase yet:
- 60 ft rope for gin pole
- electrical outlet inside the box?
- 4 gang
- also another outlet
- faceplate for outlets
- liquid-tite and hose clamps for strobe
- flex conduit for power cord from tram
- flex for power to strobe
- 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction
- 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction)
- maybe 3/4" conduit for strobe... this will go in the center pole section
- purchase guy wires (3/16")... how much ... 6pcs x 40 ft
- expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes
- cable protection for power (if not in the storage)
- something to keep the unistrut from popping off the screed stakes
- reflector tape @ Lowes