Difference between revisions of "NGEE September 2015 Barrow"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 30: Line 30:
 
=== Wednesday===
 
=== Wednesday===
 
* Return to Fairbanks
 
* Return to Fairbanks
 +
 +
 +
Tools:
 +
* 2 pcs 3/4 inch wrench (for unistrut bolts)
 +
* level
 +
* tape measure
 +
* 1/2" wrench (for ubolts)
 +
* 7/16* wrench (for ubolts)
 +
* a full set of nut drivers
 +
* electrical tape
 +
* 8pcs wire nuts
 +
*

Revision as of 14:30, 26 September 2015

NGEE Barrow trip:

To Bring:

  • Survey GPS
  • Survey Rod
  • Survey Tripod
  • UPS

Monday

  • fly up
  • survey extents of camera again
    • survey rod & gps
    • maybe bring up a water boiler and a flat pack water container.
  • take down tower
    • large wrench for unistrut fittings
    • 1/2", 7/16", 5/16" nut drivers etc
    • screw drivers
  • Go does his work

Tuesday

  • we move tower back out to cake eater road
  • put batteries back at A site
  • battery backup at control shed
  • replace dreamplug
  • visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are)
  • Ship tower back to Fairbanks

Wednesday

  • Return to Fairbanks


Tools:

  • 2 pcs 3/4 inch wrench (for unistrut bolts)
  • level
  • tape measure
  • 1/2" wrench (for ubolts)
  • 7/16* wrench (for ubolts)
  • a full set of nut drivers
  • electrical tape
  • 8pcs wire nuts