Difference between revisions of "NGEE Nome April 2016 pt2"
Jump to navigation
Jump to search
imported>Bob |
imported>Bob |
||
Line 1: | Line 1: | ||
− | Field Plans | + | ===Field Plans=== |
* First day on site set up tag line for surface water discharge measurements | * First day on site set up tag line for surface water discharge measurements | ||
* Snow survey at ___ points across the watershed (still deciding) | * Snow survey at ___ points across the watershed (still deciding) | ||
Line 13: | Line 13: | ||
** gps positiong | ** gps positiong | ||
** note time of day & date | ** note time of day & date | ||
+ | |||
+ | ===Safety Gear=== | ||
+ | * life jackets | ||
+ | * throw bag? | ||
+ | |||
+ | |||
+ | ===Field Gear=== | ||
+ | * make a bridge from unistrut for creek access | ||
+ | ** 6 or 9 5' pieces of unistrut plus wooden planks, bolt together using strut nuts | ||
+ | * velocity probe | ||
+ | ** Sontek | ||
+ | ** Flo-Mate | ||
+ | ** wading rod | ||
+ | ** waders | ||
+ | ** dry suit | ||
+ | * survey tripod | ||
+ | * total station for stage readings? | ||
+ | ** need a taller rod for the prism | ||
+ | ** or, track down optical level. | ||
+ | |||
+ | |||
+ | === Day 1 === | ||
+ | * take out bridge and related supplies | ||
+ | * bring out survey tripod | ||
+ | * start water quality sampling & discharge measurements after setting up bridge | ||
+ | * if there is still snow at the valley bottom, consider adding additional cameras to the tripods. | ||
+ | |||
+ | ===Day 2=== | ||
+ | * depending on how day one goes.. maybe drop off towards top of basin. Hike down to road measuring snow depth with an avalanche probe | ||
+ | * at the bottom, finish day by measuring discharge in the creek | ||
+ | |||
+ | |||
+ | ===Stuff i moved to NGEE conex=== | ||
+ | * survey poles | ||
+ | * yellow dry survival bag | ||
+ | * drill case & batteries & bit | ||
+ | * staff gauges | ||
+ | * blue cushion | ||
+ | * snow laser poles | ||
+ | * thaw probe | ||
+ | * Larry chair | ||
+ | * skis | ||
+ | * rebar protection (i should make a metal tag that says remove this protection before surveying) | ||
+ | * avalanche probe | ||
+ | * both light shovels | ||
+ | * 2 boxes for HMP155 & foam for CNR4 & empty box for SR50A | ||
+ | * hammer | ||
+ | * ubolt & misc bailing wire | ||
+ | * emergency pot | ||
+ | * tripods for cameras |
Revision as of 11:49, 14 April 2016
Field Plans
- First day on site set up tag line for surface water discharge measurements
- Snow survey at ___ points across the watershed (still deciding)
- survey water surface daily
- measure discharge once there is measurable flow in the creek
- build bridge across creek
- look for Bob's camera
- water quality sampling
- gps positiong
- note time of day & date
Safety Gear
- life jackets
- throw bag?
Field Gear
- make a bridge from unistrut for creek access
- 6 or 9 5' pieces of unistrut plus wooden planks, bolt together using strut nuts
- velocity probe
- Sontek
- Flo-Mate
- wading rod
- waders
- dry suit
- survey tripod
- total station for stage readings?
- need a taller rod for the prism
- or, track down optical level.
Day 1
- take out bridge and related supplies
- bring out survey tripod
- start water quality sampling & discharge measurements after setting up bridge
- if there is still snow at the valley bottom, consider adding additional cameras to the tripods.
Day 2
- depending on how day one goes.. maybe drop off towards top of basin. Hike down to road measuring snow depth with an avalanche probe
- at the bottom, finish day by measuring discharge in the creek
Stuff i moved to NGEE conex
- survey poles
- yellow dry survival bag
- drill case & batteries & bit
- staff gauges
- blue cushion
- snow laser poles
- thaw probe
- Larry chair
- skis
- rebar protection (i should make a metal tag that says remove this protection before surveying)
- avalanche probe
- both light shovels
- 2 boxes for HMP155 & foam for CNR4 & empty box for SR50A
- hammer
- ubolt & misc bailing wire
- emergency pot
- tripods for cameras