Difference between revisions of "Template:Todo"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
 
* record as-built wiring of soil sensors
 
* record as-built wiring of soil sensors
 +
 +
DFM2 Bear Damage (as of Spring 2008) EKY:
 +
 +
    * Need anemometer cable,
 +
    * solar panel,
 +
    * soil profile (?),
 +
    * electric fencing checked,
 +
    * Measure distance from ground to snow sensor

Revision as of 11:27, 6 June 2008

site TODO list

  • record as-built wiring of soil sensors

DFM2 Bear Damage (as of Spring 2008) EKY:

   * Need anemometer cable,
   * solar panel,
   * soil profile (?),
   * electric fencing checked,
   * Measure distance from ground to snow sensor