Difference between revisions of "Template:Todo"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
* record as-built wiring of soil sensors
 
* record as-built wiring of soil sensors
  
* DFM2 Bear Damage (as of Spring 2008) EKY:
+
* DFM2 Bear Damage (as of Spring 2008) EKY
 
+
**Need anemometer cable,
    **Need anemometer cable,
+
** solar panel,
    ** solar panel,
+
** soil profile (?),
    ** soil profile (?),
+
** electric fencing checked,
    ** electric fencing checked,
+
** Measure distance from ground to snow sensor
    ** Measure distance from ground to snow sensor
 

Revision as of 11:29, 6 June 2008

site TODO list

  • record as-built wiring of soil sensors
  • DFM2 Bear Damage (as of Spring 2008) EKY
    • Need anemometer cable,
    • solar panel,
    • soil profile (?),
    • electric fencing checked,
    • Measure distance from ground to snow sensor